Section 4 • Repair Procedures
March 2015
Part No. 123701
GTH-1048 • GTH-1056
4 - 5
How to Remove the Cable Bridge
Assembly , GTH-1056
Inside the four-section boom of the GTH-1056, a
cable bridge is used to route hydraulic lines
through the boom assembly to the fork level
cylinder and auxiliary connections (if equipped).
The three-section boom on the GTH-1048 does
not require the use of a cable bridge.
1 Remove the inspection cover at the pivot end of
the boom.
2 Working at the pivot end of the boom, remove
the fasteners securing the cable bridge rear
mount bracket to the boom assembly. Remove
the bracket from the boom.
3 Working at the pivot end of the boom, tag,
disconnect and plug the hydraulic hoses at the
hard lines of the cable bridge. Cap the fittings.
4 Working at the pivot end of the boom, remove
the fasteners securing the hose roller assembly
to boom tube number 1. Remove the hose roller
assembly from the boom.
5 Working at the fork end of the boom, remove
the fasteners securing the cable track mount
bracket to boom tube number 3.
6 Working at the fork end of the boom, remove
the fasteners securing the cable bridge slider to
the cable bridge. Remove the slider from the
boom.
Note: Pay attention to how the hoses are routed
before removing the slider from the boom.
Note: During reassembly, it may be helpful to use
tape to secure the bolts to the cable bridge when
installing the cable bridge slider.
7 Working at the fork end of the boom, securely
attach the loose end of the cable track to the
cable bridge using a cable tie or similar device.
8 Working at the pivot end of the boom, carefully
remove the cable bridge from the boom.
c
b
a
BOOM COMPONENTS
a
cable bridge mount bracket
b
cable track mount bracket
c
cable bridge slider
Summary of Contents for GTH-1048
Page 6: ...May 2015 GTH 1048 GTH 1056 Part No 123701 vi This page intentionally left blank ...
Page 174: ...Section 6 Schematics May 2015 6 11 Harness Map Control System Power Single Joystick 6 12 ...
Page 177: ...May 2015 Section 6 Schematics 6 14 Harness Map Control System Ground Single Joystick 6 13 ...
Page 178: ...Section 6 Schematics May 2015 6 15 Harness Map Control System Power Dual Joystick 6 16 ...
Page 181: ...May 2015 Section 6 Schematics 6 18 Harness Map Control System Ground Dual Joystick 6 17 ...
Page 190: ...Section 6 Schematics May 2015 6 27 Harness Map Options Work Lights 6 28 ...
Page 193: ...May 2015 Section 6 Schematics 6 30 Harness Map Options Road Lights 6 29 ...
Page 194: ...Section 6 Schematics May 2015 6 31 Harness Map Options Enclosed Cab with Heater 6 32 ...
Page 197: ...May 2015 Section 6 Schematics 6 34 Harness Map Options Enclosed Cab with HVAC 6 33 ...
Page 210: ...Section 6 Schematics May 2015 6 47 Hydraulic Schematic Models with Single Joystick 6 48 ...
Page 213: ...May 2015 Section 6 Schematics 6 50 Hydraulic Schematic Models with Dual Joystick 6 49 ...
Page 214: ......