INSTALLATION
PROCESSOR INSTALLATION
Exten
d
Position the processor upside down on flat, solid ground.
NOTE: Blocking may be required to raise the mounting
bracket into proper position.
Track the excavator to the processor with the jaws facing
the operator. Lift the excavator stick over the processor,
carefully positioning the stick tip connection with the pro-
cessor mounting main pivot bore. Pin the excavator stick
to the processor.
Slowly raise the boom to lift the processor, allowing the
processor cylinder pivot connection to come within range
of the excavator cylinder stroke.
Extend the excavator cylinder until the power link bore
lines up with the processor cylinder pivot connection. Pin
excavator cylinder to the processor.
Crowd and extend processor, checking closely to make
sure there is no interference between processor bracket
and hard lines. Also check for interference between cylin-
der and boom/stick.
Install excavator hydraulic hoses, supply and return, from
the stick tip to the processor manifold blocks. See drawing
3500211 for electrical circuit.
The stick and bucket circuits are oriented as to rod and
bore sides of their respective cylinders. When you connect
a circuit to the processor, take care to connect rod-to-
rod and bore-to-bore. When these are reversed, extra
pressure is needed to open the jaw, which pulls down the
engine, de-strokes the pumps, increases jaw cycle time,
creates high oil temperatures and burns more fuel.
Processor must be vertical before putting oil into it, or
an air lock in the regen valve may prevent the jaw from
opening.
BE SURE HYDRAULIC PRESSURE IS RELIEVED
BEFORE DISCONNECTING HYDRAULIC FITTINGS.
REMOVE NECESSARY FITTINGS SLOWLY.
!
WARNING