2.
Dimensioning: H - height of
opening
S - width of the
opening
Measure and mark the place where the holes are made on the guides for
assembly screws. Drill the first hole under the guides in
distance of max. 90mm from the upper edge of the building opening, further
max. every 500mm.
1.
Tools necessary to mount the blind.
The GBP LLC does not provide screws and dowels
struts and PVC tubes.
H
S
min 70mm
max 90mm
500mm
500mm
o
6
o
10
3.
Drill the holes in the guides. Drill with a diameter of 6mm make a hole
through the two guide chambers and a drill with a diameter 10mm
increase the opening in the first chamber only from the side outer guide.
MOUNTING TYPE "A"
o
10
o
o
8
15 mm
4.
When installing the blind with automatic bolts, drill through the central part
of the guide with a drill bit 8 mm in distance 15 mm from the bottom edge.
o
o
8
50 mm
5.
When installing a blind with bolts, drill a central one part of the guide
with a drill bit 8 mm in diameter of 50 mm from the bottom edge.
o
o
6
35 mm
8 mm
6.
In the case of installing a blind with a cam lock, mill the central part of the
guide with a 6 mm diameter drill in the distance 8 mm from the bottom
edge. The hole should have a length of 35 mm.
MOUNTING TYPE "A"
3
myeuropeanwindows.com