- 72 -
3. Activation system
Preparation ---------------3.1
Failure diagnosis ---------------3.2
Starting motor ---------------3.3
Starting relay -------------3.4
3.1 Preparing documents
Notes of working
The unloading of the starting engine could be carried out on the engine.
Refer to the method of unloading when unloading the engine.
Preparation standards
Item Standard
value
Service
limits
Length of the motor brush of the
starting motor
6.2mm 3.0mm
Liner of the starting idler shaft
8.3mm
External diameter of the starting
idler shaft
7.94mm
Torque tightening value
Clutch cover bolt of starting motors
12 N·m
Set screw nut
of the clutch cover of starting motors
95 N·m
Instrument
Set screw nut wrench
Universal fixed wrench
Summary of Contents for Onyx 50
Page 2: ...ONYX Service Manual Generic Motor GmbH ...
Page 8: ... 6 18 5 Solution for idle discharge value exceeding defined value two stroke 169 ...
Page 21: ... 19 system I D of brake drum rear wheel φ140mm QJ50QT 22D ...
Page 54: ... 52 ...
Page 79: ... 77 Bulbs Switches Meters ...
Page 93: ... 91 Body Panel ...
Page 105: ... 103 Rear wheel rear suspension ...
Page 113: ... 111 Fuel tank ...
Page 126: ... 124 oil pump assembly 机油泵组件 machine oil pump assembly 机油泵组件 ...
Page 137: ... 135 Cylinder body and piston ...
Page 145: ... 143 Driving disc clutch driven wheel ...
Page 152: ... 150 挡圈 retaining ring 摩擦片 abrasion piece ...
Page 158: ... 156 离合器弹簧压缩器 spring compressor of clutch Decelerator device ...
Page 173: ...171 ...