Models FL3100H/3101H
7
Proper system operation should be verified by performing a full, functional test of all component
devices of the safety system, ensuring that the proper levels of alarming occur.
Fault/Malfunction circuit operation should be verified.
Periodic Testing of Field Devices
Periodic testing should be performed per the manufacturers’ recommendations and
instructions. Testing procedures should include, but not be limited to:
Verify integrity of all optical surfaces and devices
For flame detectors, use the appropriate test lamp
When testing produces results outside of the manufacturers’ specifications, replacement of the
suspect device(s) should be performed as necessary.
Periodic System Verification
The following system verifications should be performed at least annually:
Verify wiring, terminal connections and stability of mounting for all integral safety equipment
including, but not limited to:
Power
supplies
Control
modules
Field detection devices
Signaling / output devices
Accessories connected to field and signaling devices
Proper system operation should be verified by performing a full, functional test of all component
devices of the detection system, ensuring that the proper levels of alarming occur.
Fault/Malfunction circuit operation should be verified.
Maintenance intervals should be independently established through a documented procedure,
including a maintenance log maintained by plant personnel or third party testing services.
Summary of Contents for FL3101H
Page 2: ...Models FL3100H 3101H ii This page intentionally left blank ...
Page 22: ...Models FL3100H 3101H 15 Figure 14 P N 71072 Rear View Mounting Bracket Drawing ...
Page 70: ...63 Models FL3100H 3101H 10 7 Final Assembly Figure 24 P N 71450 FL3100H UV IR Final Assembly ...
Page 71: ...Models FL3100H 3101H 64 Figure 25 P N 71451 FL3101H UV Final Assembly ...