
Introduction .................................................1
Read This Manual Thoroughly .............................................. 1
Operation and Maintenance .................................................. 1
How to Obtain Service .......................................................... 1
Authorized Dealer Locator Number ............................................ 1
Safety Rules ................................................2
General Information ....................................4
1.1 Foreward
....................................................................... 4
1.2 Introduction
................................................................... 4
1.3 Overview
....................................................................... 4
1.4 Programming
Overview
................................................. 4
Programming ...............................................4
2.1
Connecting via GenLink™ ................................................ 4
2.1.1 Local Connection .................................................. 4
2.1.2 Remote Connection .............................................. 5
2.1.3 Lan/Internet Connection ........................................ 5
Operation .....................................................5
3.1 Programming the PM-SC ............................................... 5
3.1.1 Generator Settings ............................................. 5
3.1.2 Gen ID ............................................................... 6
3.1.3 Gen Name.......................................................... 6
3.1.4 Max kW ............................................................. 6
3.1.5 Min kW .............................................................. 6
3.1.6 Max KVAR ......................................................... 6
3.2 Command
Settings
........................................................ 6
3.2.1 Exercise Programming ....................................... 6
3.2.2 kW and Power Factor Limits ............................... 7
3.2.3 Start Date and End Date ..................................... 7
3.2.4 Start Time and Stop Time .................................. 7
3.2.5 Excluded Days ................................................... 7
3.3 Holiday
Settings
............................................................ 7
3.4 System
Settings
............................................................ 7
3.4.1 Critical Load kW ................................................ 7
3.4.2 Load Shed 1, 2 & 3 kW ..................................... 8
3.4.3 ATS Critical Load ............................................... 8
3.4.4 Permissive (ATS Load) 1, 2, 3 ........................... 8
3.4.5 ATS Transfer Delay ............................................. 8
3.4.6 Generators Out of Service .................................. 8
3.4.7 Special ATS Operation ........................................ 8
3.5 Producing and Printing Reports ..................................... 8
3.6 Setting the Time & Date ................................................ 8
3.7 Communications — PM-SC to Generators ..................... 8
3.8 Communications — PM-SC to GenLink ......................... 9
3.9 Communication
Issues?
................................................ 9
3.10 Relay
Functionality
........................................................ 9
3.11 Backup Modes of Operation ........................................ 10
3.11.1 Introduction ................................................... 10
3.11.2 Abbreviations ................................................. 10
3.11.3 Documents .................................................... 10
3.11.4 Standard Control System ............................... 10
3.11.5 Normal MPS Operation .................................. 10
3.11.6 Manual Backup Operation .............................. 11
3.11.7 Automatic Backup Option ............................... 14
3.11.8 Automatic Backup Operation .......................... 14
3.12 MPS Transfer Switches ............................................... 15
3.13 Programming MTS/STS Transfer Switches .................. 16
3.14 MTS/STS Transfer Switch Mimic Diagram ................... 16
3.15 Typical Outling Wiring Diagram .................................... 16
3.16 The
Touchscreen
......................................................... 16
3.17 The Optional Remote Touchscreen Display .................. 16
3.17.1 Connection Details ......................................... 17
3.17.2 Contrast Adjustment ...................................... 17
3.17.3 Calibration ..................................................... 17
3.17.4 Cleaning ........................................................ 17
3.17.5 Touchscreen Operation ................................... 17
3.17.6 Functionality................................................... 17
3.18 Front Panel Diagnostics ............................................... 18
3.18.1 Digital Diagnostics ......................................... 18
3.18.2 Digital Input Channel Allocations .................... 19
3.18.3 Digital Output Channel Allocations .................. 19
3.18.4 Analog Diagnostics ........................................ 20
3.18.5 Analog Channel Allocations ............................ 20
3.18.6 Communication Diagnostics ........................... 20
3.19 Default Communications Parameters ........................... 21
3.20 Control Module Power Supplies ................................... 21
3.21 Connections to Power Manager Enclosure ................... 21
3.22 Operating Environmental Specification ......................... 22
3.23 Power Supply Requirement ......................................... 22
3.24 Output
Rating
.............................................................. 22
3.25 Packaging and Mounting ............................................. 22
Notes ..........................................................23
Installation Diagrams ................................26
Warranty ......................................Back Cover
Table of Contents
Summary of Contents for PowerManager 004975-2
Page 25: ...23 Notes...
Page 26: ...24 Notes...
Page 27: ...25 Notes...
Page 28: ...26 Installation Diagrams NEMA 1 Drawing No 0E7619 C...
Page 29: ...27 NEMA 1 Drawing No 0E7619 C Installation Diagrams...
Page 30: ...28 Installation Diagrams NEMA 3R Drawing No 0H3175 A...
Page 31: ...29 NEMA 3R Drawing No 0H3175 A Installation Diagrams...
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......