Maintenance
Level 1
Level 2
Level 3
Level 4
Tasks
Recom-
Task
Required
Task
Required
Task
Task
mended
Comp.
to be done
Comp.
to be done
Comp.
Required
Comp.
to be done
(Date-
3 months/
(Date-
Semi-
(Date-
to be done
(Date-
monthly
In
itials)
Break-in
Initials)
annually
Initials)
Annually
Initials)
10 Hrs.
30 Hrs.
50 Hrs.
100 Hrs.
13. Initiate an automatic start
and transfer of the unit to
site load and exercise it for
at least 1 hour looking for
leaks, loose connections
or components, and
abnormal operating
conditions. Correct as
necessary.
14. Start and exercise the unit
at full rated load (use a
load bank if the site load is
not enough) for at least 2
hours looking for leaks,
loose connections or
components, and abnormal
operating conditions.
Correct as necessary.
15. Change the engine oil.
16. Replace the engine oil
filter(s).
17. Replace the engine air
filter(s).
18. Replace the engine fuel
filter(s) on diesel engine
driven units and re-prime
the fuel system.
19. Check the engine spark
plugs on gas engine driven
units. Clean and re-gap or
replace as necessary.
20. Perform a 5 minute no-load
operational run of the unit
looking for any post service
problems.
21. Return the unit to standby
setup for operation when
required.
11-3
Standby Generator Sets
Service Schedule
SrvSchd002 Re
v. C 05/06
Summary of Contents for Guardian 005324-1
Page 24: ...Standby Generator Sets Notes...
Page 25: ...Standby Generator Sets Notes...
Page 26: ...Standby Generator Sets Notes...
Page 27: ...Standby Generator Sets Notes...
Page 28: ......
Page 30: ......
Page 32: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......