19
When valve clearance is correct, hold the pivot ball stud in place
with the allen wrench and tighten the rocker arm jam nut. Tighten
the jam nut to 174 in/lbs. torque. After tightening the jam nut,
recheck valve clearance to make sure it did not change.
Install new valve cover gasket.
•
Re-attach the valve cover.
•
NOTE:
Start all four screws before tightening or it will not be possible
to get all the screws in place. Make sure the valve cover gasket
is in place.
Install spark plugs.
•
Re-attach the spark plug wire to the spark plug.
•
Repeat the process for the other cylinder.
•
Figure 4.4 - Valve Clearance Adjustment
Jam Nut
Pivot Ball
Stud
Rocker
Arm
Valve
Stem
4.8 COOLING
SYSTEM
Air inlet and outlet openings in the generator compartment must
be open and unobstructed for continued proper operation. This
includes such obstructions as high grass, weeds, brush, leaves
and snow.
Without sufficient cooling and ventilating air flow, the engine/
generator quickly overheats, which causes it to quickly shut down
(Figure 4.5).
Make sure the doors and roof are in place during operation as
running the generator with them removed can effect cooling air
movement.
The exhaust from this product gets extremely
hot and remains hot after shutdown. High
grass, weeds, brush, leaves, etc. must
remain clear of the exhaust. Such materi-
als may ignite and burn from the heat of the
exhaust system.
Figure 4.5 – Cooling Vent Locations
AIR INTAKE
AIR OUTLET
4.9
ATTENTION AFTER
SUBMERSION
If the generator has been submerged in water, it
MUST NOT
be
started and operated. Following any submersion in water, have
a Dealer thoroughly clean, dry and inspect the generator. If the
structure (ex. home) has been flooded, it should be inspected by
a certified electrician to ensure there won't be any electrical prob-
lems during generator operation or when utility is returned.
4.10 CORROSION PROTECTION
Periodically wash and wax the enclosure using automotive type
products. Frequent washing is recommended in salt water/coastal
areas. Spray engine linkages with a light oil such as WD-40.
4.11 OUT OF SERVICE PROCEDURE
4.11.1 REMOVAL FROM SERVICE
If the generator cannot be exercised every seven days, and will
be out of service longer than 90 days, prepare the generator for
storage as follows:
1. Start the engine and let it warm up.
2. Close the fuel shutoff valve in the fuel supply line and allow
the unit to shut down.
3. Once the unit has shut down, switch to the OFF position.
4. Set the generator’s main circuit breaker to its OFF (or OPEN)
position.
5. Set the AUTO/OFF/MANUAL switch to OFF and turn off the util-
ity power to the transfer switch. Remove the 7.5A fuse from
the generator control panel. Disconnect the battery cables as
outlined in “General Hazards”.
6. While the engine is still warm from running, drain the oil
completely. Refill the crankcase with oil. See ”Engine Oil
Recommendations". Drain the oil reservoir and refill with rec-
ommended oil to the proper level.
7. Attach a tag to the engine indicating the viscosity and clas-
sification of the oil in the crankcase.
8. Remove the spark plugs and spray fogging agent into the
spark plugs threaded openings. Reinstall and tighten the spark
plugs.
9. Remove the battery and store it in a cool, dry room on a
wooden board. Never store the battery on any concrete or
earthen floor.
10. Clean and wipe the entire generator.
Maintenance
Summary of Contents for EcoGen 6kW
Page 27: ...Generac Power Systems Inc 25 25 Drawing No 0J1320 B Installation Diagram...
Page 28: ...26 Generac Power Systems Inc 26 Installation Diagram Drawing No 0J1320 B...
Page 29: ...Generac Power Systems Inc 27 27 Drawing No 0J1320 B Installation Diagram...
Page 31: ...29 Drawing No 0J1323 C Oil Make up System...
Page 32: ...30 Notes...
Page 33: ...31 Notes...