- 22 -
INSTALLATION
5.3.3.1 - Examples of installations with a 45°
bend and a 90° bend at the boiler out-
let
5.3.3.1.1 - Straight configuration
Accessories :
- 1 45° concentric elbow Ø 80/125 (3.15/4.92 inch)
- 1 90° concentric elbow
Ø 80/125 (3.15/4.92 inch),
- concentric extensions Ø 80/125 (3.15/4.92 inch),
- 1 concentric vertical terminal
Ø 80/125 (3.15/4.92 inch),
- 1 vertical terminal fastening collar (supplied with
the vertical terminal),
- 1 sleeve tile adaptable according to the type of
roof covering and the roof slope,
- 1 roof plate
,
- 3 Ø 125 (4.92 inch) fastening collars,
Note:
- Each 45° elbow added reduces the maximum au-
thorised length by 0.5 m. (1.6 ft)
- Each 90° elbow added reduces the maximum au-
thorised length by 1m (3.28 ft).
5.3.3.1.2 - Straight configuration
Accessoires :
- 1 45° concentric elbow Ø 80/125 (3.15/4.92 inch)
- 1 90° concentric elbow
Ø 80/125 (3.15/4.92 inch),
- 3 concentric extensions
Ø 80/125 (3.15/4.92 inch),
- 2 45° concentric elbow
Ø 80/125 (3.15/4.92 inch),
- 1 concentric vertical terminal
Ø 80/125 (3.15/4.92 inch),
- 1 vertical terminal fastening collar (supplied with
the vertical terminal),
- 1 sleeve tile adaptable according to the type of
roof covering and the roof slope,
- 1 roof plate
,
- 3 Ø 125 (4.92 inch) fastening collars
Note:
- Each 45° elbow added reduces the maximum au-
thorised length by 0.5 m (1.6 ft).
- Each 90° elbow added reduces the maximum au-
thorised length by 1m (3.28 ft).
Lmax = L1 + 1 m + 0,5
9 m
Lmax = L1 + 3.28ft + 1.6ft
29.5 ft
L
1
FC
X-
26-
3
rear boiler
View from above
45° elbow
90° elbow
Fig. 16
Refer to section 5.1 - page 15 - chapter V -
INSTALLATION for other outlet configurations
Lmax = L1 + 0,5 m + L2 + 0,5 m+ L3 + 1 m + 0,5
9 m
Lmax = L1 + 1.6ft + L2 + 1.6ft+ L3 + 3.28ft + 1.6ft
29.5ft
L
1
L
2
L
3
F
C
X
-27-
3
rear boiler
View from above
45° elbow
90° elbow
Fig. 17
Refer to section 5.1 - page 15 - chapter V -
INSTALLATION for other outlet configurations