We reserve the right to modify the characteristics of the equipment supplied without notice or as part of the continued development of our products.
4
•
Undo securing nuts on heater flange and remove flange complete with Electric Immersion
Heater.
•
Inspect heater elements and de-scale if necessary.
•
Inspect interior of cylinder and clean out any debris.
•
Re-assemble using a new gasket on the flange and tighten bolts.
•
Re-connect Immersion Heater wiring.
•
Refill system and check for leaks around flange.
•
Replace Electric Immersion Heater cover.
•
Carry out annual inspection as above.
3
THE OPENING TEMPERATURE OF THE P & T VALVE IS 90
o
C
The position of the tundish shall be visible to the occupants and shall be positioned away from
any electrical devices.
See Fig no. 7, Page 13 of EBS manual for tundish position and discharge pipe.
The connection details are shown on Page 13, drawing no. Fig 7. The relief valve connections
should not be altered or used for any other type of connection.
Details of the discharge pipe and installation requirements can be seen on drawing no. Fig 7,
Page 13 and Table 2, Page 6.
Before connecting pipework, fit the Siemens safety shut off zone valve to the primary return
outlet.
The incoming cold water supply pipe must be fitted with a stopcock before the cold water
unvented kit. A drain cock must be fitted between the unvented kit and the cylinder.
The unit should be carried into position within its packaging and on its pallet.
Once in position, the pallet should be removed.
The cylinder should be installed on a floor designed to take the weight of the cylinder when full
of water. Each litre of water weighs 1 Kg. The actual water content of each cylinder should
be added to the cylinder weight to obtain the total weight of the cylinder when full to ascertain
if the floor is of suitable construction.
300mm clearance should be left on the top of the cylinder for access to the anode and
inspection door.
No valve shall be fitted between the cylinder and the expansion valve.
Our optional immersion heater control panel is unique in that you cannot heat the water using
the boiler and the immersion on at the same time. The rocker switch on the control panel
either sends power to the immersion heater or to the boiler safety circuit. So, if the immersion
is on, the valve closes and the boiler cannot supply hot water to the cylinder.
No other immersion, other than our EBS Immersion Heater should be used on our EBS
cylinders.
The EBS range of cylinders is ideally suited for connection to our Geminox boilers to match
the coil ratings. However, connection to non – Geminox boilers can be carried out if required.
Please contact our Technical Department for installation assistance on + 44 (0)1372 722277.
To flush through the cylinder, simply open inspection door, disconnect unvented kit and flush
through the cylinder to the drain by using a hose through the inspection door.
100
300
Results of supply temperature 1-50 – 220
19 mins
26 mins