V
03/13
OptiFlex 2 B
Cleaning and maintenance
•
33
Cleaning and maintenance
Note:
Regular and conscientious maintenance increases the service life of
the OptiFlex 2 B manual coating equipment and provides for a
longer continuous coating quality!
The parts, which are to be replaced during maintenance work, are
available as spare parts. These parts will be found in the
corresponding spare parts list!
Daily maintenance
1. Clean the injector (see therefore the user manual of the OptiFlow
injector)
2. Clean the powder gun (For more on this, please also review the
user manual for the OptiFlex 2 GM03 manual powder gun)
3. Clean the powder hose; Please also review the section "Color
change"
Weekly maintenance
1. Clean fluidizing/suction unit, injector, rinsing module and powder
gun. The fluidizing/suction unit is placed back into the powder
shortly before restarting operation
2. Check the control unit grounding connections to the coating
booth, the suspension devices of the work pieces, or the
conveyor chain
If in disuse for several days
1. Separate from power mains
2. Clean the coating equipment
3. Turn off the compressed air main supply
Summary of Contents for OptiFlex 2 B
Page 12: ......
Page 32: ...V 03 13 30 Initial start up OptiFlex 2 B 24 25 26 27 28 29 30 31 32 33 34 ...
Page 34: ......
Page 38: ......