Transport
13
Transport
Introduction
This chapter describes special precautions that must be taken during
internal transport of the product if:
–
the customer himself must pack, transport and ship the product, in
order to have overhaul and repair work carried out by the
manufacturer
or
–
the product must be shipped for disposal (recycling).
Safety rules
Suitable equipment (e.g. a crane) must be used when moving parts that
are sometimes bulky and heavy.
Components being disassembled must be adequately secured before
they are detached.
Requirements on personnel carrying out the
work
Use only technical personnel who are trained in operating the respective
equipment (e.g. a crane).
If there are any uncertainties, please contact Gema Switzerland GmbH.
Packing material
Not necessary for the internal transport. For external transport:
Transport
Data concerning goods to be transported
–
The space requirements correspond to the size of the components
plus the packaging
–
Weight see "Technical Data"
–
Points of attachment, see "Mode of transportation"
Summary of Contents for OptiCenter OC09
Page 10: ...Rev 00 02 21 10 About these instructions OptiCenter OC09 ...
Page 52: ...Rev 00 02 21 52 Touch panel operating panel OptiCenter OC09 ...
Page 80: ...Rev 00 02 21 80 Maintenance Repairs OptiCenter OC09 ...
Page 84: ...Rev 00 02 21 84 Fault clearance OptiCenter OC09 ...
Page 88: ...Rev 00 02 21 88 Decommissioning Storage OptiCenter OC09 ...
Page 112: ...Rev 00 ...