C67
CAUTION
G
Servicing and maintenance work may
only be performed by trained personnel.
G
GEMÜ shall assume no liability
whatsoever for damages caused
by improper handling or third-party
actions.
G
In case of doubt, contact GEMÜ before
commissioning.
1. Use appropriate protective gear as
speci
fi
ed in plant operator's guidelines.
2. Shut o
ff
plant or plant component.
3. Secure against recommissioning.
4. Depressurize the plant or plant
component.
The operator must carry out regular visual
examination of the valves dependent on
the operating conditions and the potential
danger in order to prevent leakage and
damage.
The operator of the plant is
responsible for compliance with
regulations for special applications.
When ordering the valve, please
state the complete order number.
14 Disassembly
Disassembly is performed observing
the same precautionary measures as for
installation.
G
Disassemble the diaphragm valve (see
chapter 11.1 "Installing the diaphragm
valve").
CAUTION
Do not disassemble valve body and
bonnet!
®
Danger of leakage or defect!
®
Manufacturer's warranty will be voided.
15 Disposal
G
Fully rinse the diaphragm
valve before disposal.
G
All valve parts must be
disposed of according to
relevant local or national
disposal regulations /
environmental protection
laws.
G
Pay attention to adhered
residual material and gas
di
ff
usion from penetrated
media.
16 Returns
G
Clean the diaphragm valve.
G
Request a goods return declaration form
from GEMÜ.
G
Returns must be made with a completed
declaration of return.
If not completed, GEMÜ cannot process
credits or
repair work
but will dispose of the goods at the
operator's expense.
Enter data from the product label on the
declaration of return:
C67 8T7530A12 1675/HPW
PB 6 bar
ID-CH-88089374-047527
Type
Serial
number
Note for returns:
Legal regulations for the protection
of the environment and personnel
require that the completed and
signed goods return declaration
is included with the dispatch
documents. Returned goods can
be processed only when this
declaration is completed.
35 / 40
Summary of Contents for C67 CleanStar
Page 38: ...C67 38 40 ...
Page 39: ...C67 39 40 ...