H90461 / NO 10055
HYDRAULIC RAIL THREADER
TYPE MPR – M
Chap. 5 — page 30
L.GEISMAR Company
– Prohibited Reproduction©
T
HE
NEW
RAILS
ARE
UNLOADED
OUTSIDE
THE
TRACK
.
The bolts are removed from the old rails; the Rail Threader uses the new rails as
a track to move along, lifting the old rails and placing them inside or outside the track
(fig. 29)
Once the old rails have been removed, the operation is repeated at the starting
point where the pile of rails is, to have the new rails at the rated gauge ready for
fastening.
.
Fig : 29
These operations are the same as those described in
§
5.4.3 Procedure
.
During this operation is is PROHIBITED for anyone to move around in front
of and beside the Rail Threader. Any operation to be carried out in front of
or beside the machine must take place with the motor off and the parking
brake locked.
To maintain a good balance for the Rail Threader, always make sure to
handle two rails simultaneously and check that the various movements
remain symmetrical with the Rail Threader axis.
fig. 5.4.3.a
Summary of Contents for MPR-M
Page 2: ......
Page 8: ......
Page 16: ......
Page 34: ......
Page 52: ......
Page 56: ......
Page 59: ...E C B D A C B D F F ...
Page 61: ......
Page 63: ......
Page 65: ......
Page 67: ......
Page 69: ......
Page 71: ......
Page 73: ......
Page 75: ......
Page 77: ......
Page 79: ......
Page 81: ......
Page 83: ......
Page 85: ......
Page 87: ......
Page 89: ......
Page 91: ......
Page 93: ......
Page 95: ......
Page 97: ......
Page 99: ......
Page 101: ......
Page 103: ......
Page 105: ......
Page 107: ......
Page 109: ......
Page 111: ......
Page 113: ......
Page 115: ......
Page 117: ......
Page 119: ......
Page 121: ......
Page 123: ...A B C D H G F E I J ...
Page 125: ......
Page 127: ... ...
Page 129: ......
Page 131: ......