133
MAINTENANCE
Every 50 Hours
Inspecting the Bucket Stoppers
(bolts / nuts)
WARNING
Before performing maintenance or
repairs under the machine, set all working
equipment against the ground or in the
lowermost position.
1. Park the machine on firm, level ground
and remove the bucket.
2. Retract the bucket cylinders and lift arm
cylinders to the minimum length.
3. Inspect the adjusting bolts (1) and lock
nuts (2) for bending, denting, deformation
and looseness.
4. If there are any irregularities with the
adjusting bolts (1) and lock nuts (2).
Refer to page 140, “Adjusting or Replacing
the Bucket Stoppers (bolts/nuts)”.
Summary of Contents for CTL55
Page 1: ...CTL55 CTL65 CTL75 CTL85 Compact Track Loader OPERATOR S MANUAL Revision E 09 10...
Page 6: ...4...
Page 8: ...6...
Page 38: ...SAFETY 36 Safety Signs Decals...
Page 39: ...37 SAFETY Safety Signs Decals...
Page 40: ...SAFETY 38 Safety Signs Decals...
Page 66: ...64 MEMO...
Page 67: ...65 MEMO...
Page 68: ...66 MEMO...
Page 69: ...67 MEMO...
Page 70: ...68...
Page 114: ...MAINTENANCE 112 Maintenance Log Date Hours Service Procedure...
Page 115: ...113 MAINTENANCE Maintenance Log Date Hours Service Procedure...
Page 123: ...121 MEMO...
Page 129: ...127 MEMO...
Page 156: ...154...
Page 170: ...168...
Page 171: ...169 Main Speci cations 170 Machine Dimensions 174 Operating Range 176 SPECIFICATIONS...
Page 176: ...SPECIFICATIONS 174 Machine Dimensions...
Page 178: ...SPECIFICATIONS 176 Operating Range T7K0021 F H C A D B G E...
Page 180: ...178...
Page 181: ...179 General Precautions 180 Air Conditioner CTL55 182 OPTIONS...
Page 193: ...191 MEMO...
Page 194: ...192...
Page 195: ...193 INDEX...