
page | 39
A
dv
anc
ed Oper
ation
Using Syner-G™
7. Click the
Max Interval
drop-down list to select the desired time interval. This interval
represent the maximum length of time before the graphs are updated.
8. To clear the channel data from both graphs, click the
Reset
button. Click the
Stop
button to halt the link monitoring process.
When the
Stop
button is clicked, the monitoring process will stop and the button will
read
Start.
In addition, Syner-G will ask if the log file should be saved. To continue
the monitoring process, click the
Start
button.
9. Errors are automatically recorded and placed in the list box at the bottom of the
Syner-G application, as shown.
Summary of Contents for EXT-UHDA-HBT2
Page 1: ...EXT UHDA HBT2 User Manual HDBaseT Extender w RS 232 2 way IR and POH Release A2...
Page 9: ...This page left intentionally blank...
Page 10: ...This page left intentionally blank...
Page 18: ...This page left intentionally blank...
Page 31: ...This page left intentionally blank...
Page 32: ...This page left intentionally blank...
Page 54: ...This page left intentionally blank...
Page 58: ...page 48 Appendix Updating the Firmware 4 Click the Update tab Appendix...