
18
2-phase used from 3-phase
Delta — no neutral
Use 2-phase setting
L1+L2 currents return through L3
Connect PJ1 between
P7 and P10 Connect PJ2
between P13 and P74
in.yt.ce 230 V or 230/400 V
Correct wiring of the electrical service box, RCD,
and pack terminal block is essential!
Call an electrician if necessary
Electrical wiring: in.yt-ce (European)
1-phase
L1 current returns through neutral
Connect PJ1 between
P7 and P13 Connect PJ2
between P10 and P74
2-phase
with single neutral
L1+L2 currents return through neutral
Connect PJ1 between
P7 and P10 Connect PJ2
between P13 and P74
3-phase
with single neutral
L1, L2+L3 currents return
through neutral
Connect PJ1 between
P7 and P10 Connect PJ2
between P11 and P13
Warning!
inytce models must always be connected to a
circuit protected by a Residual-Current Device
(RCD) having a rated operating residual-current
not exceeding 30 mA
PJ2
PJ2
PJ1
N
L1
G
N
PJ2
PJ1
L1
L2
G
L3
PJ2
PJ1
L1
L2
G
N
PJ2
PJ1
L1
L2
L3
G
Refer to wiring diagram in the enclosure box lid for more information
Y Series wiring