assembly and installation
Installing the control unit and power supply unit
7160-9001-560
01. December 2020
Installation steps
1. Install the control unit and power supply in
the housing
- Rail (a)
- Control unit (70)
- Electrical Requirements (40)
2. Secure the components with a PPE
terminal block and end plate (20, 30).
40
70
10
Item
Part number
Description
Quantity
Control unit,
complete
VP8002 EU GEA
x
10
7159-2853-050
Housing (complete)
276x230x136
1
20
0005-4622-890
Series terminal
cage clamp 2-wire PE
1
30
0005-4617-890
End Plate
for 2 cable terminals 2.5 mm²
1
40
0005-8000-970
Power supply unit
110-240V-AC to 24V-DC 60W
1
50
7160-6942-000
Cable harness
complete
CowScout
1
60
7038-9923-000
Kit of expansion parts
cable gland M16, M20
1
70
7160-9067-260
Control unit
VP8002
1
3. Wire components internally as shown
Warning!
Electrical Hazard!
► Do not connect the power supply until the installation work has been
completed!
Wiring diagram (VP8002)
40
50
70
a
b
VP8002
- Connect the control unit to the power supply
- Connect the red and green lamps to the corresponding control outputs with
the cables provided
Indicator lights
Out
VP8002
a
Red
I/O1
b
green
I/O2