•
UV Flow Cell ÄKTApilot, 1/2/5 mm
•
Industrial Flow Cell 8 mm (tubing i.d. 8 mm)
•
Industrial Flow Cell 1" (tubing i.d. 1")
Installing UV Flow Cell 2 mm and
UV Flow Cell 10 mm
NOTICE
To avoid damaging the optical fibers, press only on the cell body,
never on the optical fibers.
Illustration
Action
Step
Unpack the flow cell. Do not remove the red protec-
tive caps from the inlet or outlet, or the black protec-
tive caps on the optical fiber connectors.
1
Slide the rear white clip on the cell holder to its inner
position for a 2 mm cell and to its outer position for
a 10 mm cell.
2
Place the flow cell in the opening between the white
clips. To improve the access to the tubing connec-
tions the cell can be positioned with the text and se-
rial number facing upwards or sideways. Press the
cell into the clips to fasten it.
3
Monitor UVis-920 Operating Instructions 29055049 AD
27
4 Installation
4.5 Installing the flow cells