Masoneilan SVi1000 Positioner Quick Start Guide
=
|
33
© 2016 General Electric Company. All rights reserved
.
Step 2: Connecting the Tubing and Air Supply
To connect the air supply:
1. Install the tubing to the air supply port. Minimum tubing diameter 1
⁄
4" (Figure 17).
Actuator
Conduit
Connection
Supply
Connection
1/4" NPT
1/4" NPT
Connection
Figure 17
Air Ports
2. Pipe the output air from the output pressure port to the actuator. Minimum tubing
diameter: 1/4".
NOTE
The SVi1000 is designed to operate with clean, dry, oil-free,
instrument grade air to ANSI-ISA-57.3 1975 (R1981) or
ISA-S7.3-1975 (R1981).