![GE SIGNA PIONEER Installation Manual Download Page 14](http://html.mh-extra.com/html/ge/signa-pioneer/signa-pioneer_installation-manual_128688014.webp)
ITEM
DESCRIPTION
1
Cryogen vent (200mm [8"] O.D.)
2
Emergency exhaust vent - refer to magnet room vent requirements (position to be defined)
3
Pressure equalization vent - refer to magnet room vent requirements (position in ceiling to be
defined)
4
(2) 38mm [1.5"] copper lines (insulated) and (2) shut off valves. refer to chilled water block
diagram
5
Closet must allow free air exchange of 400 CFM between magnet room and closet
6
(2) 50mm [2"] I.D. High pressure hoses and (2) 50mm [2"] to 38mm [1.5"] Reducers
MECHANICAL/PLUMBING NOTES
All piping, fittings, supports, hoses, clamps, ventlation systems, etc. are to be supplied and installed
by the customer or his contractors.
For complete design and requirements, specifications and guidelines refer to the pre-installation
manual: system cooling, cryogen venting, waveguides and exhaust venting.
An emergency water cooling back-up supply is recommended for continuous cryogen compressor
operation. if using an open loop back-up design, ensure a drain is provided. please refer to the
pre-install manual for optional back-up coolant supply requirements
Date
Rev
/24
EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG
A
23/Jul/2018
SIGNA PIONEER
Typical
M1 - Mechanical Layout
14
MAGNET ROOM
EQUIPMENT ROOM
CONTROL ROOM
LOCATED ELSEWHERE
1
13.76
16
2
3
5
6
4
9'-4"
11'-6"