STEP 1 
Preparation of the wall

The wall case should be installed during 
construction and lintels should be used to support 
the block above the wall case. The case will not 
support the concrete block or brick. The case is 
modular in height and width:

Height  — Fits 2 courses concrete block 
 

— Fits 6 courses standard brick 

 

— Fits 5 courses jumbo brick

Width  — Fits approximately 3 stud spaces.

For existing construction, wall openings must be 
made. Wall opening, of the proper dimensions, 
is essential to avoid the necessity of fillers or 
additional framing.

STEP 2 
Installation of the case in the wall opening

Use lintel, when required, to support brick and 
block above the case.

1. 

Position the case into the wall. Refer to chart 
on page 1 for roomside projection. The rear 
(outside) edge of the case should extend at least 

ƎEH\RQGWKHRXWVLGHZDOOWREHDEOHWRFDXON

properly and prevent sealing the drain holes in 
the rear flange  
of the case, and to facilitate easy installation of  
an accessory drain, if desired. (If it is desired to 
have the rear grille flush on the outside, a drip rail 
must  
be installed under the case and caulking applied 
between the drip rail and case.)

IMPORTANT:

Install case level from left to right and level 
from roomside to the outside.

Do not remove the cardboard stiffener inside 
the case until the chassis is installed.

2. 

Firmly secure the case to the wall structure.  

Do not drill any holes in the bottom of the 
case.

2

Main stud

+HDGHU²ƎîƎRU

 

WZRƎîƎRQHGJH

Jack studs

Cripple

Adjust 
framing to 
secure this 
dimension

( *See chart 

on page 1)

Jack studs

 16

1

»

2

Ǝ0LQ

42

3

»

8

Ǝ0LQ

“D”*

Finished 
floor

Sub-floor

Inside wall

Stiffener

Top

Secure case 
through side and/or 
top only

2” min. from  
case bottom

Summary of Contents for RAB77B

Page 1: ...urther details refer to the GE Architects Engineers Design Data Manual for Zonelines To obtain a copy of that manual call the GE Answer Center at 800 626 2000 or visit us at www Zoneline com Ceiling A B C Roomside Outside wall D Finished floor or top of carpet Printed in the United States RECOMMENDED DIMENSIONS INSTALLATION CLEARANCE A 7RS RI FDVH WR ILQLVKHG FHLOLQJ Ǝ PLQ B Projection of case int...

Page 2: ...e rear outside edge of the case should extend at least Ǝ EH RQG WKH RXWVLGH ZDOO WR EH DEOH WR FDXON properly and prevent sealing the drain holes in the rear flange of the case and to facilitate easy installation of an accessory drain if desired If it is desired to have the rear grille flush on the outside a drip rail must be installed under the case and caulking applied between the drip rail and ...

Page 3: ...oor grille Drip rail Case Caulk Flashing STEP 2 cont Installation of the case in the wall opening 3 Caulk the entire opening on the outside between the case and the building exterior 4 Caulk the entire opening on the inside between the case and the building interior NOTE When using an explosive actuating fastening tool a special nail Ref Ramset 1516SD drive pin 2 1 2 lg 9 64 dia with 7 8 dia steel...

Page 4: ...ll extend to a wall receptacle located within the area shown in tabulation below Wall Receptacles All wiring should be made in accordance with local electrical codes and regulations See the Owner s Manual for how to connect electrical supply NOTE Aluminum wiring in structure may pose special problems consult a qualified electrician Inside A B Model A B 6HULHV Ǝ Ǝ 230V 208V 15 amp 230V 208V 20 amp ...

Page 5: ...ntion des architectes et ingénieurs pour les appareils Zoneline Pour obtenir une copie de ce manuel contactez le GE Answer Center au 800 626 2000 ou visitez nous au www Zoneline com Plafond A B C Côté pièce Mur extérieur D Finished floor or top of carpet Imprimé aux États Unis Instructions d installation pour votre nouveau boîtier de climatiseur autonome Avant de commencer Lisez ces instructions a...

Page 6: ...bordure arrière extérieure du boîtier doit s allonger d au moins po au delà du mur extérieur pour être en mesure de calfeutrer correctement et éviter de sceller les trous de drainage dans la bride arrière du boîtier et pour faciliter l installation d un si vous souhaitez que la grille arrière soit installée en affleurement à l extérieur il faut poser une gouttière sous le boîtier et appliquer le c...

Page 7: ...er Calfeutrer Solin ÉTAPE 2 suite Installation du boîtier dans l ouverture murale 3 Calfeutrez l ouverture complète sur l extérieur entre le boîtier et l extérieur du bâtiment 4 Calfeutrez l ouverture en entier sur l intérieur entre le boîtier et l intérieur du bâtiment REMARQUE Lors de l utilisation d un fixateur à cartouches un clou spécial réf pistolet à effet direct nº 6 JRXSLOOH PROHWpH j FDU...

Page 8: ...ectrique REMARQUE le câblage en aluminium dans une structure peut poser des problèmes particuliers consultez un électricien professionnel Intérieur A B Modèle A B Série AZ 21po 58po 9 9 DPS 9 9 DPS 9 DPS type tandem type perpendiculaire type tandem VIS Type A MÉTAL Squaredrainholes Neoprenespongegasket Steelmountingplate Type B screws 1 2 O D draintube Alternate 6 long 1 2 O D straight coppertube ...

Reviews: