
49-2000833 Rev. 0
17
3 INSTALL LOWER HORIZONTAL
SUPPORTS TO HOOD ASSEMBLY
• Install the lower horizontal support to 4 lower vertical
supports with 8 - 4.2x8 mm screws.
A. Lower horizontal support
B. 8 - 4.2x8 mm screws
C. 4 - Lower vertical supports
INSTALL CEILING SUPPORT
• Using 4 wood screws provided, attach the ceiling
support to the ceiling over duct opening hole
using pilot holes drilled in step 1.
1 MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly
with the front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Determine wire access hole location.
• Center punch all screw and determined wire hole
locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16”
bit and drill approximately 1-1/2” deep.
• Drill one 1/2” hole for wires.
• Cut the 8-1/2” duct opening through the ceiling.
2
36" HOOD
TEMPLATE
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
8-1/2"
FRONT OF HOOD
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
8-1/4" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
31-14772
Printed in Mexico 12-08 JR
Screws
Front
Installation Preparation
INSTALLATION PREPARATION: V
e
nted Outside
A
B
C
Summary of Contents for Profile PV977
Page 25: ...49 2000833 Rev 0 25 Notes...
Page 26: ...49 2000833 Rev 0 26 Notes...