GFK-3002A
October 2017
16
Basic Start-up Steps:
For startup and configuration of the CPE400, complete the following steps. For full
details on CPE400 operation, refer to the
PACSystems RX3i and RX7i CPU Reference
Manual,
GFK-2222Y or later.
1.
Mount the CPE400, as described in Section 2.2 and per the
Installation and
Maintenance Requirements
document, GFK-3004.
2.
Attach the user-supplied power supply cable as described in Section 2.4 if no
Energy Pack is being used.
3.
(optionally) Mount and attach the compatible Energy Pack, IC695ACC403, as
described in the
PACSystems RX3i Rackless Energy Pack IC695ACC403 Quick Start
Guide,
GFK-3000.
4.
Turn on the power supply unit: the unit should then run without the need to press
any buttons.
5.
If not previously configured, configure the RX3i PLC using PME 9.00 SIM 8 or later,
as described in the
Configuration
section below.
Note:
When the ACC403 Energy Pack is powered up, a finite period is required to
charge it up to its operating level. During this time, the Energy Pack will
indicate this condition via its LEDs (refer to the
PACSystems RX3i Rackless
Energy Pack IC695ACC403 Quick Start Guide,
GFK-3000).
The CPE400 will begin its boot cycle immediately upon power application.
However, the embedded controller will not start its control until the ACC403 is
charged. This typically takes 45 seconds or less. In the event the ACC403 is
faulty or is not communicating, CPE400 commences operation without the
Energy Pack.
Note:
In the event of loss of power, with the ACC403 Energy Pack connected and
charged up, the CPE400 remains on for 4 seconds to backup user memory
into its non-volatile memory.