![GE P485 Instruction Manual Download Page 65](http://html.mh-extra.com/html/ge/p485/p485_instruction-manual_128504065.webp)
APPLICATION EXAMPLE
P485 MODBUS TO PROFIBUS CONVERTER – USER GUIDE
9–9
STEP 4: CONNECT
DEVICES TO THE SUB-
NETWORK
The fourth step in the configuration wizard is to connect the configured device types to the
sub-network. The PQMII and MM2 devices are connected in this step.
1.
Click
Next
to proceed to create nodes on Modbus network as shown below.
Figure 9-11: Connect devices to sub-network
2.
There are two nodes on the Modbus network: the PQMII meter and the MM2 relay. To
insert a node, click the
Create Node
button.
3.
Set the
Node Name
as “PQMII Meter”, the
Slave Address
to “20”, and the
Device Type
to “PQMII”.
Figure 9-12: Node for PQMII meter
4.
Similarly create another node for the MM2. Set the
Node Name
as “MMII Relay”, the
Slave Address
to “4”, and the
Device Type
as “MM2-MM3”.
Figure 9-13: Node for MM2 relay
5.
Click
Next
to proceed to step 5 of the configuration wizard.
Summary of Contents for P485
Page 2: ......
Page 36: ...4 14 P485 MODBUS TO PROFIBUS CONVERTER USER GUIDE SOFTWARE OVERVIEW ...
Page 42: ...5 6 P485 MODBUS TO PROFIBUS CONVERTER USER GUIDE COMMUNICATION MODEL ...
Page 56: ...8 6 P485 MODBUS TO PROFIBUS CONVERTER USER GUIDE ADVANCED FUNCTIONS ...
Page 74: ...10 2 P485 MODBUS TO PROFIBUS CONVERTER USER GUIDE MISCELLANEOUS ...