
g
EV Charging Station
User Manual & Installation Instructions
GE EV Charging Station User Manual
8 of 86
BASE MOUNTING ASSEMBLY – DURING CONCRETE POUR. ALLOW MIN. 5” CONDUIT LENGTH
ABOVE CONCRETE FLOOR LEVEL
Adjust (4) ½-13 nuts to position height as shown in Figure 4.
Pour concrete to level shown in Figure 4. Do not cover the ½-13 nuts with concrete. Remove
mounting template from threaded rods, after concrete has cured. Do not remove the ½-13 nuts as
they are used for leveling the skirt.
Figure 4
5.50