
g
EV Charging Station
User Manual & Installation Instructions
GE EV Charging Station User Manual
42 of 86
Re-attach the RFID unit or metal plate as described in Section 2.9.1.
2.9.3
Holding Socket
This section describes how to install the holding socket for Pedestal, Wall Mounted and Pole Mounted
EVSE units only.
For the Back to Back EVSE unit holding socket replacement, contact a GE
representative by calling 1-800-GE1STOP.
Open the service door and unplug the holding socket Phoenix connector from the controller as shown
in Figure 47. Remove the holding socket wire from this Phoenix connector. The wire can be removed
from the Phoenix connector by pressing in the small orange button on the connector, as shown in
Figure 47.
Figure 45: VFD/RFID mounting plate, front view
Figure 46: VFD/RFID mounting plate, back view
WARNING
: Make sure power to the EVSE is
disconnected before performing any task