background image

2 E

  

SECURING UPPER MICROWAVE/ADVANTIUM OVEN 

TO CABINET

For double oven with microwave or Advantium upper ovens. Secure a wooden cleat to side of 
cabinet so that the upper oven can be secured to the cleat with provided screws 

27” Cabinet requirements

•   No shims (or cleats) required when cabinet is in 

minimum width condition.

•   If cabinet is at maximum width condition, add wood 

shims to bring cabinet to minimum condition.

30” Cabinet requirements

•   No shims (or cleats) required when cabinet is in 

minimum width condition.

•   If cabinet is at maximum width condition, fix the wood 

cleats as shown in illustration.

2 F

  

CUTOUT FOR INSTALLATION OVER A 

WARMING DRAWER

NOTE: 

Install the oven only with specific models listed on the label located on top of the oven.

NOTE: 

Additional clearances between cutouts may be required. Check to be sure the oven 

supports above the Warming Drawer location do not obstruct the required interior depth and height.
When installing a Warming Drawer below a single, double, or combination oven, a separate 
120V, 60 HZ, properly grounded receptacle must be installed. Refer to installation instructions 
packed with the Warming Drawer for specific installation requirements.

Anti-Tip Block Against 

Rear Wall Per Warming 

Drawer Requirement

2" (5.1 cm) 

Min. 

Per Warming 

Drawer 

Requirement

Continue to Section 3 for Double Wall Oven with Pedestal. Otherwise, continue to Section 4.

3 A

  

DETERMINING WHEN TO USE THE PEDESTAL 

(30” DOUBLE OVENS ONLY)

WHEN TO USE THE PEDESTAL

When replacing an older GE Appliances 30” double wall oven with a new GE Appliances model. 
Cutout height = 51-13/16” to 51-15/16”. This is our traditional cutout height.

WHEN NOT TO USE THE PEDESTAL

When replacing a 30” double wall oven from another manufacturer (ie. Whirlpool) with a new 
GE Appliances 30” double wall oven. Cutout height = 50-1/4”. You will need to verify that the 
existing cutout matches the 50-1/4” dimension.

If the new GE Appliances 30” double wall oven is being installed into new construction (ie. not a 
replacement), then the recommended installation is to use the Pedestal.

3 B

  

PEDESTAL RAIL INSTALLATION 

(30” DOUBLE OVENS ONLY)

A. 

 Position the pedestal rails with the top cutout toward the front of the opening and the flanges 
on the bottom, pointing toward the center.  Locate each rail on the floor or cabinet runner, 
slightly inward from the side of the cabinet.  Make sure the front of each rail is not protruding 
beyond the front of the cabinet opening.

B.

  Drill pilot holes and attach rails to runner or bottom of cabinet with provided hardware.

Flanges toward 
center of cutout

Top cutout 
toward front

Attachment 
screws

6.375”

27.5”

1.5”

3.0”

Cleat locations on 30” cabinet 

with maximum cutout condition

Wood Cleats

Summary of Contents for Monogram MOCTWODW108

Page 1: ...o remove plastic on trims and panel all tape around the oven and any shipping screws securing the oven to the base pad Open oven door and remove literature pack and oven racks Remove the bottom trim from the top of the oven It will be installed at the end of the installation process The trim is wrapped separately and taped to the top of the unit Remove pedestal rails from separate box and set asid...

Page 2: ...30 Single Oven A Cabinet Width 25 63 5 cm min 251 4 64 1 cm max 281 2 72 4 cm min 285 8 72 7 cm max B Cutout Height 275 8 70 2 cm min 281 8 71 4 cm max 271 4 69 2 cm min 275 16 69 4 cm max C Clearance from cutout top 1 2 5 cm 1 2 5 cm 11 4 3 2 cm for PT9050 ZET1S and ZET1P D Clearance from cutout bottom 1 2 5 cm 11 4 3 2 cm E Clearance from cutout side edges 1 2 5 cm 11 16 1 75 cm F Junction Box L...

Page 3: ...n 11 4 3 2 cm 11 4 3 2 cm H Junction Box Location 83 4 22 2 cm max right side only 91 2 24 1 cm max right side only 91 2 24 1 cm max right side only J Height to Bottom of Junction Box 44 111 8 cm 47 119 4 cm 47 119 4 cm K Recommended Cutout Location from Floor 131 4 33 7 cm 12 30 5 cm 12 30 5 cm Dim Description 27 Oven with Microwave 30 Oven with Microwave A Cabinet Width 27 68 6 cm 30 76 2 cm B C...

Page 4: ...ement 2 5 1 cm Min Per Warming Drawer Requirement Continue to Section 3 for Double Wall Oven with Pedestal Otherwise continue to Section 4 3 A DETERMINING WHEN TO USE THE PEDESTAL 30 DOUBLE OVENS ONLY WHEN TO USE THE PEDESTAL When replacing an older GE Appliances 30 double wall oven with a new GE Appliances model Cutout height 51 13 16 to 51 15 16 This is our traditional cutout height WHEN NOT TO ...

Page 5: ... WARNING To prevent shock remove house fuse or open circuit breaker before beginning installation WARNING Improper connection of aluminum house wiring to copper leads can result in an electrical hazard or fire Use only connectors designed for joining copper to aluminum and follow the manufacturer s recommended procedure closely We recommend you have the electrical wiring and hookup of your applian...

Page 6: ... and the oven black lead to the branch circuit black lead in accordance with local codes using wire nuts C Install proper strain relief clamp D Install junction box cover Ground and neutral wires white Tape or Crimp Neutral wire connection Black Red Branch circuit Alternate knockout Range conduit snaps into box Junction Box Cover 5 ELECTRICAL REQUIREMENTS CONT This appliance must be supplied with ...

Page 7: ... oven B Lift oven into cabinet cutout using the oven opening as a grip Carefully push against oven front frame Do not push against outside edges C As you slide the oven back pull the string so that the conduit will lie on top of the oven in a natural loop For a combination oven pull the conduit so that it sits above the lower oven on the left side as viewed from the front D When you are sure the c...

Page 8: ...y see Section 11 Ensure that air duct opening at bottom of unit is free of obstructions Check that oven rack guides if applicable are installed correctly and oven racks function smoothly If applicable install handles following handle installation instructions and check that both ends are secured OPERATION CHECKLIST Turn on the power to the oven refer to your Owner s Manual Verify that the bake and...

Page 9: ...ordes y panel toda la cinta que cubre el horno y los tornillos de envío que fijan el horno a la almohadilla base Abra la puerta del horno y quite el material informativo y las bandejas del horno Quite el reborde inferior de la parte superior del horno Se colocará al final del proceso de instalación El reborde se encuentra envuelto en forma separada y adherido en la parte superior de la unidad Reti...

Page 10: ...abinete 25 63 5 cm mín 251 4 64 1 cm máx 281 2 72 4 cm mín 285 8 72 7 cm máx B Altura de la abertura 275 8 70 2 cm mín 281 8 71 4 cm máx 271 4 69 2 cm mín 275 16 69 4 cm máx C Espacio desde la abertura parte superior 1 2 5 cm 1 2 5 cm 11 4 3 2 cm para PT9050 ZET1S y ZET1P D Espacio desde la abertura parte inferior 1 2 5 cm 11 4 3 2 cm E Espacio desde la abertura extremos laterales 1 2 5 cm 11 16 1...

Page 11: ...rtura parte superior 1 2 5 cm min 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P 1 2 5 cm min 11 4 3 2 cm para PT9550 ZET2S y ZET2P G Espacio desde la abertura parte inferior 1 2 5 cm min 11 4 3 2 cm 11 4 3 2 cm H Ubicación de la caja de conexiones 83 4 22 2 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho 91 2 24 1 cm max sólo lado derecho J Altura hasta la parte inferior de la caj...

Page 12: ...gabinete se encuentra en la condición de ancho máximo repare los tacos de madera como se muestra en la ilustración 3 B INSTALACIÓN DEL RIEL CON PEDESTAL 30 HORNOS DOBLES ÚNICAMENTE A Posicione los rieles del pedestal con la abertura superior hacia el frente de la abertura y las lengüetas de la parte inferior apuntando hacia el centro Ubique cada riel sobre el piso o la corredera del gabinete levem...

Page 13: ... este aparato ADVERTENCIA Para prevenir una descarga eléctrica quite el fusible o abra el interruptor de circuitos antes de comenzar la instalación ADVERTENCIA Una conexión inadecuada de cableado doméstico de aluminio con cables de cobre puede generar un peligro eléctrico o un incendio Sólo use conectores diseñados para unir cobre con aluminio y siga al pie de la letra el procedimiento recomendado...

Page 14: ...1 kg Conecte el conducto flexible a la caja de conexiones eléctrica como se indica abajo Posicione el conducto de modo tal que se apoye detrás de la unidad en un círculo natural cuando el horno sea instalado Tendrá que comprar una abrazadera para alivio de tensión apropiada para completar la conexión del conducto a la caja de conexiones Los hornos vienen equipados con un conducto de 40 o 54 de lon...

Page 15: ...s locales A Evite que el conductor neutro blanco quede enredado con cualquier otro cable De ser necesario corte el conductor neutro blanco y luego vuelva a pelar el mismo a fin de exponer la longitud adecuada del conductor B Conecte el cable a tierra del aparato verde o cobre de acuerdo con los códigos locales C Conecte el cable neutral blanco del horno con el neutral de circuito derivado blanco o...

Page 16: ... obstrucciones Controle que las guías de los estantes del horno si corresponde estén instaladas de forma correcta y que los estantes del horno funcionen de forma fluida Si corresponde instale las manijas siguiendo las instrucciones de instalación de las mismas y controle que ambos extremos se encuentren asegurados LISTA DE CONTROL DE FUNCIONAMIENTO Accione la energía del horno consulte el Manual d...

Reviews: