![GE Masoneilan SVI FF Quick Starter Manual Download Page 8](http://html.mh-extra.com/html/ge/masoneilan-svi-ff/masoneilan-svi-ff_quick-starter-manual_133073008.webp)
© 2017 General Electric Company. All rights reserved
.
8 |
=
GE Oil & Gas
Installation and Set Up
The steps necessary to complete the SVI FF installation and software setup are outlined in
Table
1.
Table 1: SVI FF Installation Steps
Step No.
Procedure
1
Attach mounting bracket to the actuator.
2
Install the SVI FF magnetic assembly (rotary valves only).
3
Assemble the SVI FF on the bracket that is mounted to the valve actuator.
4
Connect the pneumatic tubing to the SVI FF.
5
Connect the air supply to the SVI FF.
6
Connect the positioner to the H1 segment by installing the SVI FF wiring.
7
Configure/calibrate using ValVue, the SVI FF DTM or a handheld using the
DD. See“Example Configuration” on page
13 for a general example.
WARNING
Failure to adhere to the requirements listed may cause loss of life
and property.
Before installing, using, or carrying out any maintenance tasks
associated with this instrument, READ ALL THE INSTRUCTIONS
CAREFULLY.
Summary of Contents for Masoneilan SVI FF
Page 4: ...This page intentionally left blank ...
Page 31: ......