© 2017 General Electric Company. All rights reserved
.
Masoneilan SVI FF Positioner Quick Start Guide
=
|
19
GE Oil & Gas
ES-776 Rev L
Page 3 of 14
Copyright 2016. This document and all information herein is the property of Dresser Inc.
1
INTRODUCTION
This manual covers the requirements for safe installation, repair, and operation of the SVI FF
positioner as it relates to operation in areas where there is a potential for explosive
atmosphere or flammable dust. Adherence to these requirements assures that the SVI FF
positioner will not cause ignition of the surrounding atmosphere. Hazards related to control
of the process are beyond the scope of this manual.
For mounting instructions on specific valves refer to the mounting instructions supplied with
the mounting kit. Mounting does not affect the suitability of the SVI FF positioner for use in a
potentially hazardous environment.
For language translation assistance contact your local representative or email
.
Pour la langue de traduction aide, contactez votre représentant local ou envoyez un e-mail
.
The SVI FF positioner is manufactured by:
Dresser
Inc.
12970 Normandy Blvd.
Jacksonville FL – 32221 – USA
Summary of Contents for Masoneilan SVI FF
Page 4: ...This page intentionally left blank ...
Page 31: ......