GE Power Management
LPS-O Line Protection System
5-
19
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
5.3 PHASE-TO-PHASE ZONE REACH TESTING
5
Figure 5–3: PHASE-REACH TIMER TEST CONNECTIONS
3 PHASE, 4 WIRE
V O L T A G E S O U R C E
P H A S E S E Q U E N C E :
A, B, C
S I N G L E P H A S E
C U R R E N T S O U R C E
R A T E D D C P O W E R
S U P P L Y
48, 125, 230 V DC
A25
A9
C 1 0
C 1 1
C 1 2
X
Y
C 4
C 6
C 9
A18
A2
N
I
op
N
V C
V B
VA
VA
V B
V C
+
C A S E G R O U N D
S U R G E G R O U N D
Programmable
Contact A1
RELAY
UNDER
TEST
START
STOP
A1
A17
C 2
P R E C I S I O N T I M E R
STOP
START
X and Y are connected
to produce a phase-to-
phase fault. See the
Table below.
Phase
under test
INPUT Y
(terminal
block number)
INPUT X
(terminal
block number)
AB
C1
C3
BC
C3
C5
CA
C5
C1
Summary of Contents for LPS-O
Page 2: ......
Page 4: ......
Page 14: ...x LPS O Line Protection System GE Power Management TABLE OF CONTENTS ...
Page 208: ...9 8 LPS O Line Protection System GE Power Management 9 3 TROUBLESHOOTING 9 SERVICING 9 ...
Page 226: ...10 18 LPS O Line Protection System GE Power Management 10 8 HELP MENU 10 ALPS TEST PROGRAM 10 ...
Page 288: ...B 4 LPS O Line Protection System GE Power Management B 2 FIGURES APPENDIXB B ...
Page 292: ...C 4 LPS O Line Protection System GE Power Management C 1 KEYPAD MENUS APPENDIXC C ...
Page 294: ...D 2 LPS O Line Protection System GE Power Management D 1 WARRANTY INFORMATION APPENDIXD D ...
Page 306: ...xii LPS O Line Protection System GE Power Management INDEX INDEX ...
Page 307: ...GE Power Management LPS O Line Protection System NOTES ...