LX: OPM_LPA_11U_5K0_10K_1US_V021
29
GE DE LanPro-11U UPS: Installation / User Manual 2.1 (US)
GE Digital Energy
g
5.3.4 Setup Menu
To enter the setup menu:
1. Be sure the UPS is switched off.
2. Press push-button 'enter/reset' (front panel) and then
turn switch ‘UPS on/off’ (rear panel) into position ‘on’ (up).
Keep enter/reset pressed until setup menu appears.
Using push-buttons 'up' and 'down' you can scroll through the several setup screens, 'enter/reset' confirms a screen
choice. After selecting a setup screen you can scroll through its settings using the push-buttons 'up' and 'down', a
setting is confirmed by pressing 'enter/reset'. To abort the setup procedure (i.e. without changing the setting) just
wait the 20 seconds time-out period after which the default screen will return.
The intro setup screen. 'Enter/reset' returns to the default screen. You can also wait
20 seconds: the time-out period of no key activity.
Pressing ‘up’ displays the screens in the following order:
A short reminder that the new settings will be valid immediately after depressing
the ‘enter/reset’ key.
Changes the language of the screen messages: you can select English, German,
French, Italian, Spanish.
The system input voltage: Range 120/208/240 Vac.
The system output voltage. Range: 120/208/220/230/240 Vac.
The system output frequency. Range: 50/60 Hz.
CAUTION!:
Changing of the output frequency can cause severe damage
of equipment connected to the UPS: Be sure that the new frequency is
suitable for the connected equipment.
The frequency tracking range (in which the output converter frequency will follow
the bypass frequency). Range: 2/4/6 %.
If the bypass frequency is beyond the setting, the output converter will return to the
fixed crystal controlled frequency.
The frequency tracking speed range (in which the output converter frequency will
follow the bypass frequency).
Range: NORMAL (1Hz/sec), HIGH (5Hz/sec).
Battery capacity. Range: 7 through 590 Ah, in 1 Ah steps.
WARNING!
If you proceed, the information about the actual battery
condition (as a result of a deep battery test) is lost. For more info see
section 5.4.3 'Deep Battery Test'.
The fan speed. Range: 0 / 1. Proper setting optimizes the cooling capacity of the
fans installed.
DO NOT READJUST
! Incorrect setting may lead to reduced lifetime
of the power semiconductors.
Setting ‘YES’ means that the function is activated: the UPS will switch off during a
utility failure when the load is less than 2% of the maximum load. Range: YES/NO.
NOTE:
if the
LanPro
®
-U
operates in parallel the no-load shutdown function is not
available. In this case do not activate this function: its setting should read "NO".
6(7836&5((16
(17(55(6(7H[LW
:$51,1*287387
&+$1*(621/,1(
/$1*8$*(
(1*/,6+
28738792/7$*(
9
)5(48(1&<5$1*(
3///2&.63(('
1250$/
)$1&859(
12/2$'6+87'2:1
<(6
287387)5(48(1&<
+]
%$77(5<&$3$&,7<
$K
,138792/7$*(
9