
LX: OPM_LPA_11U_5K0_10K_1US_V021
10
GE DE LanPro-11U UPS: Installation / User Manual 2.1 (US)
GE Digital Energy
g
4.4.1
Installation Procedures
4.4.1.1 Standard installation procedure: input voltage 208-240Vac, output voltage 120/208/220/230/240Vac.
If a battery extension pack is to be installed, please proceed with section 4.4.5.
If 2, 3 or 4 parallel operating units will be installed, please proceed with section 4.4.6.
The numbers between (brackets) refer to figure 19 in section 5.1.
1.
Mount the levellers: position A to fix the UPS to the floor,
position B to lift the castors from the floor.
2.
Loosen the screws and remove the conduit box (17) and
the metal cover plate (11).
3.
Make sure that all circuit breakers (7-8-9) are in ‘off’
position (down).
4.
Input/output connection:
Lead the input/output cables through the cable inlet. If the
cables come from below (recommended for 8kVA and
10kVA models), you can rotate the cable inlet 90 degrees.
Connect the input/output wires to the I/O terminals (11a
and 11b). Please refer to section 4.4.2 1 (input) and 4.4.3
(output) for detailed information.
5.
Re-install the metal cover plate (11) and the conduit box
(17).
6.
An emergency shutdown switch can be connected to
connector J3 on the RS232/Contact Interface Card,
between pins 3 and 4. See section 6.2 for more
information.
7.
For advanced communication possibilities, the
RS232/contact interface port (12a) can be connected to a
computer system. See section 6.1 for more information.
8.
The middle ‘option slot’ (13) allows easy installation of
plug-in cards: SNMP Card or Relay Card. See sections
6.3 and 6.4 for more information.
9.
The right ‘option slot’ (14) allows easy installation of the
RPA-card (Redundant Parallel Architecture). If the card is
already mounted, and if the unit is intended to be used
stand-alone, a bus terminator (delivered with the unit) has
to be placed in one of the two bus connectors on the card.
If the unit will be part of a parallel system, see sections
4.4.6 and 7.3 for more information.
10. Connect the utility power to the UPS.
11. If hardware modifications were necessary in step 4
because the I/O voltages are different from the default
(208Vac), software modifications should be performed as
well. Proceed with 4.4.4.
12. For a quick start proceed with section 5.2 ‘Start-up’.
Figure 6.
LanPro
®
5/68/10-11U:
Standard installation procedure
1
A
B
2
3
UPS
UTIL.
BYPASS
ON
OFF
L1 L2
4
5
6
7
8
9
1-2 BATTERY
DISCONNECTED
3-4 EMERGENCY
SHUTDOWN
see 6.3-4
see 4.4.6 / 7.3
stand-alone,
and RPA card
available: