GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
8-90
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
5.) Remove the battery.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-36-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-124 Pull out the battery from SYSCON PWA
Table 8-37 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-36. Equipment
passed all required tests and is ready for use. “
SYSCONML Assy Function Validation