GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-73
11.)Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-28-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Table 8-29 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-28. Equipment
passed all required tests and is ready for use. “
APS/APS Pro Assy PCB Function Validation