14
Installation Checklist.
Water Supply
■
Water heater completely filled
with water.
■
Air purged from water heater and
piping.
■
Water connections tight and
free of leaks.
Water Heater Location
■
Close to area of vent.
■
Indoors and protected from
freezing temperatures.
■
Proper clearance from combustible
surfaces observed and water heater
not installed on carpeted floor.
■
Sufficient fresh air supply for
proper operation of water heater.
■
Air supply free of corrosive
elements and flammable vapors.
■
Provisions made to protect area
from water damage.
■
Sufficient room to service heater.
■
Combustible materials, such as
clothing, cleaning materials, rags, etc.
clear of the base of the heater.
Gas Supply
■
Gas line equipped with shut-off
valve, union and sediment trap.
■
Approved pipe joint compound used.
■
Soap and water solution used to
check all connections and fittings
for possible gas leak.
■
Gas Company inspected installation
(if required).
Relief Valve
■
Temperature and Pressure Relief
Valve properly installed and
discharge line run to open drain.
■
Discharge line protected from
freezing.
Venting
■
Flue baffle properly hung in top of
heater’s flue.
■
Draft hood properly installed.
■
Vent connector(s) pitched upward
to chimney (1/4” per foot of length
minimum).
■
Vent connector(s) securely
fastened together with screws.
■
Single wall vent connector(s) at
least 6” from combustible material.
Customer Service
T
roubleshooting Tips
Care and Cleaning
Operating Instructions
Installation Instructions
Safety Instructions