1) Fixation 
The support of the outdoor unit shall be fixed onto the wall surface, and then the outdoor unit shall be fixed onto 
the support horizontally. In case the outdoor unit is wall-mounted or roof-mounted, the support shall be firmly 
fixed, to avoid the damage of strong wind.  

2) Installation 

of 

connecting pipes 

The cone of the connecting pipes shall be aligned with the conical surface of corresponding valve connector.  
The nut of connecting pipes shall be installed at a proper position and then be tightened with a spanner. Excessive 
tightening torque shall be avoided, or otherwise the nut may be damaged.  

• Vacuumizing 

A digital vacuum gauge shall be connected for vacuumizing. The duration of vacuumizing shall be at least 15 

minutes, and the pressure of the vacuum gauge shall be below 60Pa.Afterwards, the vacuumizing equipment shall 
be closed, and whether the reading of the digital vacuum gauge is increased or not shall be observed after the 
pressure is maintained for 5 minutes. In case no leakage is identified, the two-way stop valve and three-way stop 
valve of the outdoor unit may be opened. Finally, the vacuumizing hose connected to the outdoor unit can be 
disassembled.  

• Leak 

Detection 

The joint of connecting pipes for the outdoor unit shall be subject to leak detection with soap bubble or 

dedicated leak detection equipment.  

• 

Post-installation Inspection Items and Test Run 

Post-installation Inspection Items 

Items to Be Checked 

Consequence of Improper Installation 

Whether the installation is firm or not 

The unit may fall, vibrate or make a noise 

Whether the inspection on air leakage is completed The refrigerating capacity (heating capacity) may be 

insufficient 

Whether the unit is fully insulated 

Condensation or drip may occur 

Whether the drainage is smooth or not 

Condensation or drip may occur 

Whether the power voltage is identical to that 
marked on the nameplate 

Failure may occur or the parts may be burned 

Whether the circuit and pipeline are installed 
correctly 

Failure may occur or the parts may be burned 

Whether the unit is safely earthed 

Electric leakage may occur 

Whether the type of wire is in line with relevant 
regulations 

Failure may occur or the parts may be burned 

Whether barriers are identified at the air inlet/outlet 
of the indoor/outdoor unit 

The refrigerating capacity (heating capacity) may be 
insufficient 

Whether the length of refrigerant pipes and the 
refrigerant amount charged are recorded 

The refrigerant amount charged cannot be confirmed 

Test Run 
1. Preparations 

(1)  Power on is not allowed before all the installation operations are completed and before the leak 

detection is proven qualified.  

(2)  The control circuit shall be connected correctly and all the wires shall be firmly connected.  
(3)  The two-way stop valve and three-way stop valve shall be opened. 
(4)  All the scattered articles (especially the metal filing and thread residue) shall be removed from the unit 

body.  

2. Methods 

(1)  Switch on the power supply and press the “ON/OFF” on the remote controller, after which the air 

conditioner will start operating.  

(2)  Press “Mode” to select refrigeration, heating and sweeping wind, and observe whether the air 

conditioner is under normal operation. 

6

Summary of Contents for GES-NIG25OUT

Page 1: ...e front grille Loading and Unloading Transporting Management Storage Requirements 3 Installation Instructions 3 Relocation Procedures 7 Maintenance Instructions 7 Scrapping and Recovery 10 Indoor Outd...

Page 2: ...n easily nd it Install the air conditioner in accordance with the instructions in this installation manual Be sure to use only the specified accessories and parts for installation work Install the air...

Page 3: ...lation Air conditioners must be treated at a specialized treatment facility for reuse recycling and recovery By ensuring this product is disposed of correctly you will help to prevent potential negati...

Page 4: ...e white or red white reflective stripes shall be pasted on the sides and tail of the transporting vehicles to remind the vehicles behind of keeping distance 9 The transporting vehicles shall run at a...

Page 5: ...re source and oil heater shall be avoided below the indoor unit 4 The power supply shall be provided with earthing wire and be reliably earthed 5 While punching the wall with an electric drill whether...

Page 6: ...ting solution The pressure shall be maintained for more than 5 minutes and then whether the system pressure is reduced or not shall be observed In case the pressure is reduced leakage can be identifie...

Page 7: ...tallation is firm or not The unit may fall vibrate or make a noise Whether the inspection on air leakage is completed The refrigerating capacity heating capacity may be insufficient Whether the unit i...

Page 8: ...ontainer internal refrigeration pipelines and refrigeration elements the maintenance at the user s site is allowed including the cleaning and dredging of the refrigeration system requiring no disassem...

Page 9: ...Nitrogen cylinders acetylene cylinders and oxygen cylinders shall be placed separately The distance between the gas cylinders above and the working area involved in open fire shall be at least 6m The...

Page 10: ...the refrigeration system shall be earthed The refrigerant charged shall be of the type and volume specified on the nameplate Excessive charging is not allowed After maintenance of the refrigeration sy...

Page 11: ...During the use of refrigerant charging tools cross contamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possible...

Page 12: ...vacuumized before usage and be kept under normal temperature if possible The recovery equipment shall always be under favorable working state and be equipped with operation instructions to facilitate...

Page 13: ...y attaching a vibration proof mat The marks from to in the gure are the parts numbers The distance between the indoor unit and the oor should be more than 2m The models adopt HFC refrigerant R32 more...

Page 14: ...e Heating insulating material Piping hole cover Fixing of outdoor unit Fix the unit to concrete or block with bolts 10mm and nuts rmly and horizontally When tting the unit to wall surface roof or roof...

Page 15: ...WARNING CAUTION N Open the window and well ventilated the room explosion proof fuse 14...

Page 16: ...32 3 fire or explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 15...

Page 17: ...R32 2 3 R 2 3 R R32 R32 R32 R32 R32 16...

Page 18: ...shock fire or explosion Install a explosion proof breaker for current leakage at the power source to avoid the risk of the electric shock Do not use large capacity fuses steel wire or copper wire Dam...

Page 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32 18...

Page 20: ...3 R32 R32 R32 R32 R32 R32 R32 19...

Page 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A 20...

Page 22: ...G50OUT GES NMG70OUT GES NJG25OUT 800 280 550 510 130 313 GES NJG35OUT 800 280 550 510 130 313 GES NJG50OUT GEM NM40OUT M 780 270 540 566 106 5 317 GEM NM50OUT M 810 288 688 583 113 5 319 5 800 280 550...

Page 23: ...tion A is more than 5m oil trap shoud be installed every 5 7 Max Length In case the pipe length B is more thanDm the refrigerant should be charged according to E g m Connection of pipes charge additio...

Page 24: ...23...

Page 25: ...24 R32 R32...

Page 26: ...mm2 4G1 0mm 2 4G1 0mm 2 GES NIG25OUT GES NIG35OUT GES NMG25OUT GES NMG35OUT GES NJG25OUT GES NJG35OUT GES NJG50OUT GES NMG50OUT GES NIG25OUT GES NMG25OUT GES NIG35OUT GES NMG35OUT GES NJG50OUT GES NMG...

Page 27: ...poor 17 16 15 Lack of refrigerant Check if there is leakage in the unit m 26 Model Connecting wiring Power cable 3G2 5 mm 2 4G1 0 mm 2 DOUBLE DOUBLE GEM NM40OUT M GEM NM50OUT M GEM NM40OUT M GEM NM50...

Reviews: