Electrical Safety Requirements 

Note:
1. 

The surrounding conditions (ambient temperature, direct sunlight and rainwater) shall be noticed during 

electrical wiring, with effective protective measures being taken.  
2. 

Copper wire cable in line with local standards shall be used as the power line and connector wire.  

3. 

Both the indoor unit and outdoor unit shall be reliably earthed.  

4. 

Wiring for the outdoor unit shall be made first and then the indoor unit. The air conditioner can only be 

powered on after wiring and pipe connection.  
5. 

The dedicated branch circuit must be used, and leakage protector with sufficient capacity must be installed.  

• 

Qualification Requirements of Installer 

Relevant qualification certificate must be obtained as per national laws and regulations.  

• 

Indoor Unit Installation 

1. 

Fixation of wall panel and piping layout 

In case of left/right water pipe connection for the indoor unit, or in case the evaporator interface of the indoor 

unit and the horn mouth of the connecting piping cannot be extended to the outdoor side for installation, the 
connector pipes shall be connected to the evaporator piping interface of the indoor unit in the process of horn 
mouth.  

2. Piping 

layout 

During layout of connecting pipes, drain hose and connector wires, the drain hose and connecting wire shall 

be placed at the bottom and top respectively. The power line cannot be twined with the connector wire. The drain 
pipes (especially inside the room and machine) must be winded with thermal insulation materials.  

3. 

Nitrogen charging for pressure maintaining and leak detection 

After the evaporator of the indoor unit is connected to the connector pipe (after welding), nitrogen more than 

4.0MPa shall be charged inside the evaporator and the piping connected to evaporator with a nitrogen cylinder 
(adjusted by a reducing valve). Afterwards, the valve of the nitrogen cylinder shall be closed, for leak detection
with soapy water or leak detecting solution. The pressure shall be maintained for more than 5 minutes, and then 
whether the system pressure is reduced or not shall be observed. In case the pressure is reduced, leakage can be 
identified. After the leak point is handled, the steps above shall be repeated.  

After the evaporator of the indoor unit is connected to connecting piping, nitrogen shall be charged for 

pressure maintaining and leak detection. Afterwards, the evaporator shall be connected to the two-way stop valve 
and three-way stop valve of the outdoor unit. After the copper cap of the connecting piping is fastened, nitrogen 
more than 4.0MPa shall be charged at the access hole of the three-way stop valve with a charging hose. The valve 
of the nitrogen cylinder shall be closed, for leak detection with soapy water or leak detecting solution. The 
pressure shall be maintained for more than 5 minutes, and then whether the system pressure is reduced or not shall 
be observed. In case the pressure is reduced, leakage can be identified. After the leak point is handled, the steps 
above shall be repeated.  

The operation above can also be completed after the indoor unit is connected to the connecting pipelines and 

the two-way stop valve and three-way stop valve of the outdoor unit, after the access hole of the outdoor unit is 
connected to the nitrogen cylinder and pressure gauge and after more than 4.0MPa nitrogen is charged. No leak 
points are identified in the leak detection at the joint/welding junction of the indoor unit and at the joint of 
connecting pipelines of the two-way stop valve and three-way stop valve of the outdoor unit. It must be 
guaranteed that each joint is available for leak detection during installation.  

The next step (vacuumizing with a vacuum pump) can only be continued after the installation steps (nitrogen 

charging for pressure maintaining and leak detection normal) are completed. 

• 

Outdoor Unit Installation 

1. Fixation 

and 

connection 

Note:
a) 

Fire source shall be avoided within 3m around the place of installation.  

b) 

The leak detection equipment of refrigerant shall be placed at a low position in the 

outdoor, and shall be opened.  

5

Summary of Contents for GES-NIG25OUT

Page 1: ...e front grille Loading and Unloading Transporting Management Storage Requirements 3 Installation Instructions 3 Relocation Procedures 7 Maintenance Instructions 7 Scrapping and Recovery 10 Indoor Outd...

Page 2: ...n easily nd it Install the air conditioner in accordance with the instructions in this installation manual Be sure to use only the specified accessories and parts for installation work Install the air...

Page 3: ...lation Air conditioners must be treated at a specialized treatment facility for reuse recycling and recovery By ensuring this product is disposed of correctly you will help to prevent potential negati...

Page 4: ...e white or red white reflective stripes shall be pasted on the sides and tail of the transporting vehicles to remind the vehicles behind of keeping distance 9 The transporting vehicles shall run at a...

Page 5: ...re source and oil heater shall be avoided below the indoor unit 4 The power supply shall be provided with earthing wire and be reliably earthed 5 While punching the wall with an electric drill whether...

Page 6: ...ting solution The pressure shall be maintained for more than 5 minutes and then whether the system pressure is reduced or not shall be observed In case the pressure is reduced leakage can be identifie...

Page 7: ...tallation is firm or not The unit may fall vibrate or make a noise Whether the inspection on air leakage is completed The refrigerating capacity heating capacity may be insufficient Whether the unit i...

Page 8: ...ontainer internal refrigeration pipelines and refrigeration elements the maintenance at the user s site is allowed including the cleaning and dredging of the refrigeration system requiring no disassem...

Page 9: ...Nitrogen cylinders acetylene cylinders and oxygen cylinders shall be placed separately The distance between the gas cylinders above and the working area involved in open fire shall be at least 6m The...

Page 10: ...the refrigeration system shall be earthed The refrigerant charged shall be of the type and volume specified on the nameplate Excessive charging is not allowed After maintenance of the refrigeration sy...

Page 11: ...During the use of refrigerant charging tools cross contamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possible...

Page 12: ...vacuumized before usage and be kept under normal temperature if possible The recovery equipment shall always be under favorable working state and be equipped with operation instructions to facilitate...

Page 13: ...y attaching a vibration proof mat The marks from to in the gure are the parts numbers The distance between the indoor unit and the oor should be more than 2m The models adopt HFC refrigerant R32 more...

Page 14: ...e Heating insulating material Piping hole cover Fixing of outdoor unit Fix the unit to concrete or block with bolts 10mm and nuts rmly and horizontally When tting the unit to wall surface roof or roof...

Page 15: ...WARNING CAUTION N Open the window and well ventilated the room explosion proof fuse 14...

Page 16: ...32 3 fire or explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 15...

Page 17: ...R32 2 3 R 2 3 R R32 R32 R32 R32 R32 16...

Page 18: ...shock fire or explosion Install a explosion proof breaker for current leakage at the power source to avoid the risk of the electric shock Do not use large capacity fuses steel wire or copper wire Dam...

Page 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32 18...

Page 20: ...3 R32 R32 R32 R32 R32 R32 R32 19...

Page 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A 20...

Page 22: ...G50OUT GES NMG70OUT GES NJG25OUT 800 280 550 510 130 313 GES NJG35OUT 800 280 550 510 130 313 GES NJG50OUT GEM NM40OUT M 780 270 540 566 106 5 317 GEM NM50OUT M 810 288 688 583 113 5 319 5 800 280 550...

Page 23: ...tion A is more than 5m oil trap shoud be installed every 5 7 Max Length In case the pipe length B is more thanDm the refrigerant should be charged according to E g m Connection of pipes charge additio...

Page 24: ...23...

Page 25: ...24 R32 R32...

Page 26: ...mm2 4G1 0mm 2 4G1 0mm 2 GES NIG25OUT GES NIG35OUT GES NMG25OUT GES NMG35OUT GES NJG25OUT GES NJG35OUT GES NJG50OUT GES NMG50OUT GES NIG25OUT GES NMG25OUT GES NIG35OUT GES NMG35OUT GES NJG50OUT GES NMG...

Page 27: ...poor 17 16 15 Lack of refrigerant Check if there is leakage in the unit m 26 Model Connecting wiring Power cable 3G2 5 mm 2 4G1 0 mm 2 DOUBLE DOUBLE GEM NM40OUT M GEM NM50OUT M GEM NM40OUT M GEM NM50...

Reviews: