DigitalFlow™ GF868 Startup Guide (1 and 2-Channel)
33
Chapter 3. Operation
Chapter 3. Operation
3.1 Introduction
See Chapter 1,
Installation
, and Chapter 2,
Initial Setup
, to prepare the system for operation. When the meter is ready
to take measurements, proceed with this chapter. The following specific topics are discussed:
•
Powering Up
•
Using the Display
•
Taking Measurements
Note:
All inputs and outputs of the Model GF868 are calibrated at the factory, prior to shipment. If it becomes
necessary to recalibrate any of the inputs and/or outputs, see Chapter 1,
Calibration
, of the
Service Manual
.
WARNING!
To ensure the safe operation of the Model GF868, it must be installed and operated
as described in this manual. In addition, be sure to follow all applicable local safety codes and
regulations for the installation of electrical equipment.
Summary of Contents for DigitalFlow GF868
Page 2: ......
Page 4: ...ii no content intended for this page...
Page 30: ...Chapter 1 Installation DigitalFlow GF868 Startup Guide 1 and 2 Channel 20...
Page 42: ......
Page 58: ...48 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 62: ...52 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 68: ...Appendix C Optional Enclosures DigitalFlow GF868 Startup Guide 1 and 2 Channel 58...
Page 74: ...Warranty 64 DigitalFlow GF868 Startup Guide 1 and 2 Channel no content intended for this page...
Page 78: ......
Page 79: ......