
Programming with PanaView
C-15
April 2008
Changing Meter Settings
Through PanaView, GC868 users can handle remote programming of
the meter. They can:
•
Program and change a meter’s operating parameters;
•
Set up, start, and stop logs;
•
Calibrate and test inputs and outputs;
•
Clear various files.
To access meter programming:
1.
Enter the
New Meter Browser
option from the “File” menu.
2.
Expand the network tree until you reach the desired meter.
3.
Then expand the meter tree as shown in Figure C-18 below.
Figure C-18:
New Meter Browser
with Meter Branch
Summary of Contents for DigitalFlow GC868
Page 8: ...Chapter 1 ...
Page 61: ...Chapter 2 ...
Page 78: ...Chapter 3 ...
Page 91: ...Chapter 4 ...
Page 105: ...Chapter 5 ...
Page 111: ...Chapter 6 ...
Page 123: ...Appendix A ...
Page 132: ...Appendix B ...
Page 133: ...Data Records Option Cards Installed B 1 Initial Setup Data B 2 ...
Page 136: ...Appendix C ...
Page 156: ...Appendix D ...