February 2009
2-10
Resetting and Updating
Installing New Software
(cont.)
7.
After the update is done, the “Final Window” appears as the
CTF878 reboots (see Figure 2-14 below).
Figure 2-14: Final Window
Completion
When the transfer is complete, to prepare the CTF878 for operation:
1.
Disconnect the power to the CTF878.
!WARNING!
The main power to the CTF878 must be disconnected
before proceeding.
2.
Open the enclosure, remove the main aluminum shroud and locate
the J13 header connector (above the display connector) on the
main board (see Figure 2-3 on page 2-4).
3.
Reinstall the "CONFIG" jumper on the top two pins.
4.
Reinstall the shroud, close the cover, and reapply power to the
CTF878.
Summary of Contents for CTF878
Page 1: ...GE Sensing Model CTF878 Clamp On Tag Flowmeter User s Service Manual ...
Page 2: ...GE Sensing Model CTF878 Clamp On Tag Flowmeter User s Service Manual 910 254SA4 February 2009 ...
Page 6: ...Chapter 1 ...
Page 18: ...Chapter 2 ...
Page 30: ...Chapter 3 ...
Page 43: ...Chapter 4 ...
Page 51: ...Chapter 5 ...
Page 63: ...Appendix A ...
Page 64: ...Service Record Introduction A 1 Data Entry A 1 ...