BEFORE YOU BEGIN
7
Installation
Range Hood
Instructions
Read these instructions completely and carefully.
•
IMPORTANT –
Save these
instructions for local inspector’s use.
•
IMPORTANT –
Observe all
governing codes and ordinances.
•
Note to Installer –
Be sure to leave these
instructions with the Consumer.
•
Note to Consumer –
Keep these instructions
for future reference.
•
Skill level
– Installation of this vent hood requires
basic mechanical and electrical skills.
•
Completion time
– 1 to 3 hours
•
Proper installation is the responsibility of the
installer.
•
Product failure due to improper installation is not
covered under the Warranty.
18"
21"
35-7/8"
12"
18"
21"
29-7/8"
12"
PRODUCT DIMENSIONS
WARNING –
Before beginning the
installation, switch power off at service panel and lock
the service disconnecting means to prevent power
from being switched on accidentally. When the service
disconnecting means cannot be locked, securely
fasten a prominent warning device, such as a tag,
to the service panel.
FOR YOUR SAFETY:
Questions?
Call 1-800-561-3344
or Visit our Website at: www.
GEAppliances.ca
Due to the weight and size of these vent hoods and to
reduce the risk of personal injury or damage to the
product,
TWO PEOPLE ARE REQUIRED FOR
PROPER INSTALLATION
.
CAUTION:
1 Ft = 0.3 m
1” = 2.5 cm
30” Models
Requires a 30” Wide Opening
36” Models
Requires a 36” Wide Opening