AMX−4+ FUNCTIONAL CHECK
(MODEL 2169360, 2236420 & 2275938 SERIES)
DIRECTION 2173224−100
GE HEALTHCARE
REV 8
21
SECTION 4
POWER CORD CHECK
Requirements are pass or fail. Service is required if any Requirement is failed. After each
Requirement is verified, place a check in its box. Record notes and comments next to
the Requirement.
Fluke ESA612 tool
Ground Resistance testing
This procedure is intended for the field engineer and describes the test procedure for
the IEC 62353 Planned Maintenance and power plug replacement for the mobile X-ray
products.
The IEC 62353: Medical Electrical Equipment - Planned Maintenance and power plug
replacement of Medical Electrical Equipment standards ensures the electrical safety of
medical electrical equipment.
Perform Ground Resistance testing
Site Location
Installation
PM
Repair
Within USCAN
Fluke ESA612
Fluke ESA612
Fluke ESA612
Outside USCAN
Hioki Tool Using 25A current source
Fluke ESA612
Fluke ESA612
Perform Leakage Current testing
Site Location
Installation
PM
Repair
Within USCAN
Fluke ESA612
Fluke ESA612
Fluke ESA612
Outside USCAN
Fluke ESA612
Fluke ESA612
Fluke ESA612
Personnel requirements
Required Persons: 01
Timing: 30mins
PM frequency: 12 months
Inspect
Requirement
I
nspector’s Notes
4−1
Power Cord
Visual Inspection Ground
Impedance Test
□
Verify good condition of power cord and
plug.
□
Use a Dale 600 or Fluke ESA612 Safety
Analyzer (or equivalent) to verify the
following:
Ground impedance shall not exceed 0.15
ohms from the ground pin of the plug to any
accessible conductive part which could
become live.
Summary of Contents for AMX 4+
Page 35: ......