6
31-2000354 Rev. 0
Standard Installation Preparation
PREPARE THE OPENING
(CONT.)
Installation over a Wall Oven:
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
45-1/4”
Min.
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
Per Oven
Requirement
• If you are replacing an electric double oven with the
combined installation of an Advantium Built-In Oven
and a single oven, use the dimensions shown. The
middle rail separating the two openings may need to
be larger than the 2” minimum shown.
PREPARE THE OPENING
(CONT.)
Installation over a Wall Oven and Warming
Drawer:
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by
2x4 or 2x2
Runners all
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
Min.
Per warming drawer requirement
2” Min.
(3” recommended)
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting the
cabinet load, in addition to the added weight of the
oven and drawer, plus additional oven loads.
Summary of Contents for Advantium CSB913
Page 15: ...31 2000354 Rev 0 15 Notes ...