background image

9

 

Testing and closing 

 

1

 Run 

UPS Configuration

 tool to check if the new firmware it is correctly installed.

 

 

 

 

 

2

 

Slide in

 the control board into the VH cabinet.

 

 

Modifications reserved 

13 

ISG_VHS_FRM_UPD_XGB_V010.doc 

Summary of Contents for 1000 VA

Page 1: ...uide Digital Energy Uninterruptible Power Supply On line VH Series UPS 700 1000 1500 2000 3000 VA GE Consumer Industrial SA General Electric Company CH 6595 Riazzino Locarno Switzerland T 41 0 91 850 51 51 F 41 0 91 850 51 44 www gedigitalenergy com ...

Page 2: ...itching off and unplug the battery 4 4 Remove top cover of the UPS 5 5 Remove dangerous voltage 6 6 Unplug the control board 8 7 Programmer plug in 9 8 Firmware update 11 9 Closing and testing 13 Modifications reserved 2 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 3: ...ealth and safety requirements and working conditions are authorized to be responsible for the safety of the equipment at all times whilst carrying out their normal duties and are therefore aware of and can report possible hazards observe IEC 60364 and national wiring regulations and accident prevention rules GE refuses any responsibility in case of non observance unauthorized alterations or improp...

Page 4: ...o switch off the UPS then disconnect the mains cable 2 Pull out the lower part of the front panel to remove it 3 Disconnect the DC connector of the internal batteries then press the keypad I to discharge the capacitors Modifications reserved 4 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 5: ...he UPS horizontally on a table or desk 2 Remove the 3 screws how indicated on the picture 3 Slide out the cover in the indicated direction and Pull up the cover to remove it from the UPS Modifications reserved 5 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 6: ...e UPS is uncovered use the proper caution to not damage the board and all the electrical parts 1 Wait 10 Minutes to allow discharge of the DC Capacitors Put a multimeter on the 2 indicated points to check if the capacitor is discharged remaining voltage has to be less than 20V Use a 100 Ohm 10 Watt resistor to discharge the capacitor on the correct indicated points how shown in the picture Modific...

Page 7: ...Battery plug Wait 10 Minutes to allow discharge of the DC Capacitors Remove dangerous voltage and then remove the UPS cover following instructions on page 5 Measure the voltage across R316 R345 and R317 R346 20 Volt For VH700 VH1500 measure voltage on resistor R345 R346 and for VH2000 VH3000 on R316 R317 Modifications reserved 7 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 8: ...e the 3 cables and the small board how indicated on the picture 2 Remove the 2 screws that keep the lock tab for the control board 3 Slide up the control board out of the VH cabinet Modifications reserved 8 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 9: ...E8a Programmer Top view of the IM0128A5 Board 1 Insert the J1 connector of the VH Prog Board in mid position of J4 connector of the IM0128A5 NOTE Pay attention that J1 pins are correctly fixed on J4 connector Fig 1 Modifications reserved 9 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 10: ...the flat cable to the E8a Programmer Fig 3 4 Top view of the final cabling for the firmware update with the VH Programming Board for Digital Energy VH Series NOTE Pins 13 and 14 are 5V plug in and pins 15 and 16 are GND plug in Fig 4 Modifications reserved 10 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 11: ...Software Update Double click on the File named VHSeriesV6RX hws Where X is the firmware version HEW tool will automatically open 2 Configure settings in popup screen as follows 3 After pressing the OK button confirm 20 MHz selection and the Firmware will automatically be uploaded Modifications reserved 11 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 12: ...han one Unit or exit if programming procedure is finished 6 Once that the UPS has been replaced and E8a is connected to the new Control board connect again by pressing Connect button as shown in following picture and restart from point 1 Modifications reserved 12 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 13: ...sting and closing 1 Run UPS Configuration tool to check if the new firmware it is correctly installed 2 Slide in the control board into the VH cabinet Modifications reserved 13 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 14: ...he control board 4 Reconnect the 3 cables and the small board on the control board how indicated in the picture 5 Put the cover on the VH cabinet and Slide in the cover on the indicated direction Modifications reserved 14 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 15: ...indicated on the picture 7 Reconnect the DC connector of the internal batteries 8 Pull in the lower part of the front panel to cover it 9 The UPS it is now ready to operate Modifications reserved 15 ISG_VHS_FRM_UPD_XGB_V010 doc ...

Page 16: ... at work GE Consumer Industrial SA General Electric Company CH 6595 Riazzino Locarno Switzerland T 41 0 91 850 51 51 F 41 0 91 850 51 44 www gedigitalenergy com Modifications reserved 16 ISG_VHS_FRM_UPD_XGB_V010 doc ...