•
6
Lock the 3 screws how indicated on the picture.
•
7
Reconnect the DC connector of the internal batteries.
•
8
Pull in
the lower part of the front panel to cover it.
•
9
The UPS it is now
ready to operate.
Modifications reserved
15
ISG_VHS_FRM_UPD_XGB_V010.doc