The operator can be connected to a suitable 240v a.c 10A power circuit provided it is done so by a

licensed person and rules in AS/NZS 3000:2007 are adhered to.

- The operator can be ordered with separate power supply remote from operator making it easier to run low
voltage to the operator in situations where its difficult or not practical to run 240v ac. Special attention will
have to be made to the wire size used in this case to allow for voltage drop.

- Solar power can be used to power the operator instead of connecting 240v.  This unit can be supplied to
run on solar power by special order.

-

Conduits preferably need to come through base plate knock out. A plan view diagram is provided below to help

plan the conduit installation positions.

-

If extra low voltage control cable runs are over 10m, Shielded cable should be used and the shield connected to the

chassis.

3.

I

NSTALLATION

D

ETAILS

Plan View and Operator Dimensions

Summary of Contents for GDS 450 LVL

Page 1: ...tenance Manual Commercial Sliding Gate Operator MODEL GDS 450 LVL 2 SPEED WITH ELSEMA MCS V2 ECLIPSE OPERATING SYSTEM MADE IN AUSTRALIA FROM AUSTRALIAN QUALITY IMPORTED COMPONENTS A B N 62 059 806 405 Nov 2016 V1 00 N14870 ...

Page 2: ...Installation details 4 7 Plan view Operator Dimensions Mechanical Installation Electrical Connections Control Inputs Outputs Control board layout 4 Factory Parameter Settings 7 5 Commissioning 8 Programming remote controls 6 Manual Release 9 7 Maintenance details 10 8 Warranty 11 ...

Page 3: ...y necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to flooding etc All electrical connections and wiring must be performed with AS NZS 3000 2007 as the guidelines Or its counterpart for other countries outside of Australia and New Zealand WARNING ELECTRICITY CAN KILL The manufa...

Page 4: ...40v ac Special attention will have to be made to the wire size used in this case to allow for voltage drop Solar power can be used to power the operator instead of connecting 240v This unit can be supplied to run on solar power by special order Conduits preferably need to come through base plate knock out A plan view diagram is provided below to help plan the conduit installation positions If extr...

Page 5: ...y tek screwed to gate rail After fixing the rack for the full length of the gate run the gate back and check the rack meshes to the pinion gear without being too high or too low PLACE THE OPERATOR IN CORRECT POSITION PINION WHEEL TO BE PARALLEL TO THE GATE AND STEPPED OUT TO ALLOW FOR WIDTH OF RACK ONCE IT IS MOUNTED ONTO THE GATE FRAME MARK OUT FIXINGS AND FIX OPERATOR TO THE CONCRETE PAD FIX RAC...

Page 6: ...s Used for initiating a partial opening Photo Beam P E N C safety input Can be set for n o operation if needed through menu 3 1 PE beam operation modes can be changed through menu 4 2 Control Outputs Motor 1 Power output to motor 1 Polarity doesn t matter as motor direction can be checked and changed through the initial I learn set up procedure 12v dc Supplies regulated 12v dc at a max of 250 ma c...

Page 7: ... OFF 8 1 OPEN OBSTRUCTION MARGIN M 1 3A 8 2 CLOSE OBSTRUCTION MARGIN M 1 3A 8 3 OPEN AND CLOSE SLOW SPEED OBSTRUCTION MARGIN M 1 2A 8 4 OBSTRUCTION DETECTION RESPONSE TIME FAST 8 5 SLOW SPEED DETECTION RESPONSE TIME FAST 9 1 OPEN SPEED 100 9 2 CLOSE SPEED 100 9 3 OPEN AND CLOSE SLOW SPEED 35 10 3 ELECTRONIC BRAKING ON 10 5 CLOSING DIRECTION GATE MOVEMENT AFTER OBSTRUCTION REVERSE FULLY 14 7 FUSE R...

Page 8: ...ctivates the switch from the correct side or direction or swap over the limit switch wire inputs on the board Once set correctly proceed to the I Learn menu menu No 11 The control board will have been set with factory settings as shown above but the limits have not yet been learnt through the I learn procedure This can be done by following the prompts on the screen Upon power up the controller wil...

Page 9: ...rn inhibits the operation of the operator Gate can now be opened by hand To re engage the clutch move the gate by hand into approx the half way position and turn the Knurled knob clockwise until it is tight If when turning the knurled knob clockwise and it just spins either try spinning it clockwise with more force to release it off of the hexagonal retaining nut or hold the nut with one hand and ...

Page 10: ...will not run inadvertently Gate rolls freely when in manual Gate wheels and guide rollers in good condition Gate stops are installed and in good condition not loose Gate rack is tight correct clearances between pinion wheel rack Gate track is not damaged Gate operator mounting bolts tight No oil leaks from gearboxes Gearbox mounting bolts nuts tight Inside operator and control box clean Baygon Sur...

Page 11: ...ING CIRCUMSTANCES i IF NO PROOF OF DATE OF PURCHASE CAN BE PRODUCED ii IF THE PRODUCT HAS BEEN USED IN A MANNER BEYOND ITS DESIGN PARAMETERS iii IF THE PRODUCT IS TAMPERED WITH OR REPAIRED BY PERSONNEL NOT AUTHORISED TO DO SO iv IN RESPECT OF LOSS OR DAMAGE CAUSED BY ROUGH TREATMENT v IF THE PRODUCT IS NOT USED AND MAINTAINED IN ACCORDANCE WITH INSTRUCTIONS OR RECOMMENDATIONS LISTED IN THIS INSTAL...

Reviews: