WARNING
More than one person may be needed when loading and unloading
the
shipping crate in order to avoid body injury or damage to the machine.
1.1
Unloading and Unpacking
The GCC LaserPro DFS is shipped in one crate that contains machine, software, and
all of the necessary accessories. The following section shows detailed step-by-step
instructions for unpacking and assembly the accessory to workstation.
1)
Move the shipping crate to the proximity of the designated work area.
2)
Remove the bolt.
NOTE
Please keep and store the original shipping crate in case it is needed for future
transportation or product servicing.
Summary of Contents for LaserPro DFS
Page 1: ......
Page 4: ...Chapter 1 Unpacking Unloading Unpacking...
Page 6: ...3 Loosen the door lock...
Page 9: ...Chapter 2 Mechanical Overview Front View Right View Left View Rear View...
Page 12: ...2 4 Rear View Ventilation Openings Maintenance Door...
Page 15: ...3 Click Next 4 The installation would be finished in few seconds...
Page 46: ...4 From the drop down menu of Printer select SmartCONTROL...
Page 63: ...5 Click Vision on the menu bar and check the mark 1 and Mark 2 are definition automatically...
Page 68: ...14 Click Use CCD and Execute to start laser processing...
Page 89: ...7 After the settings of output parameter click Execute to start laser processing...
Page 90: ...Chapter 6 Appendix GCC LaserPro DFS Specification Sheet...