background image

3.0 INSTALLATION PROCEDURE

 

 

3.1 

Unpacking Instructions

 

 

 

To unpack the machine, carefully remove the staples and open the carton. Remove 
the packing material from the top and around the machine, and lift the machine 
straight up out of the carton. Place the machine on a table near a 120 VAC or 220-
240 VAC grounded outlet, and remove the plastic bag. 

 

3.2 

Power Cord Configuration

 

 
 

This machine is supplied with a power cord terminating in a conventional three 
prong electrical plug. Under no circumstances should the grounding prong of the 
power cord be removed to facilitate connection to a non-approved outlet. 

 

3.3 

Checking Machine Operation

 

 
 

The handle should operate with relative ease. Leave it in the "up" or starting 
position after testing several times. 

 
 

With the handle in the starting position, check the pressure  

bar to ensure  it can 

be easily lowered and raised by the operator. Leave it in the "up" position after 
testing several times. 

 
 

The machine is now ready to operate. Instruct operator in   proper punching and 
binding procedures.  Point out the operating instructions found in the waste tray, 
and leave the owner's guide for the customer. Be sure to stress the importance of 
the document being properly placed on the locating pin for binding. 

  
 
 
 
 
 
 
 
 
 
 
 
 

3-1

 

Reviews: