- 17 -
8 Installation and connections (Gas and electricity))
a/ Electrical connection
Mark
Designation
E1
Power cable (supplied with unit) L = 1,00m (3 x 0,75 mm2)
E2
Junction box
E3
Power supply unit
E4
Power box (accessory Gaz Industrie)
E5
Power supply 230V 50Hz phase neutral earth
E6
Space sensor (accessory Gaz Industrie)
CAREFUL : In no case should the electrical cable be located on stay on the converter or
on the fonctional block of the appliance.
b/ Flue system
F1
Flue outlet connection Ø100 (accessory Gaz Industrie)
F2
Exhaust pipe Ø97 made of rigid material (not supplied)
c/ Gas connection
G0
Gas connection of the unit - G ¾
″
gas male
G1
Flexible pipe (special model, NF approved for public buildings)
Ensure pipe is not liable to pressure load.
(possible to replaced with copper tube with min. Ø500mm)
G2
Pressure relief valve(installed upstream of each unit conform the gas supply
pressure)
G3
Gas filter
G4
Cut-off valve ¼ turn per unit
G5
Gas pipe
G6
Main cut-off valve
Summary of Contents for BTwin BTH25
Page 2: ... 2 ...
Page 6: ... 6 3 Dimensions Combustion air inlet opening Flue pipe outlet opening ...
Page 26: ... 26 ...
Page 27: ... 27 ...
Page 28: ... 28 ...